|
|
|
|
Contract Management - Drawings and Drawing Sets
Other documentation that is revised and bundled into sets, such as specifications or conceptual reports can also be tracked in the Drawings module. Process
Benefits
Drawings
The General Tab provides a place to record basic Drawing information, such as the Number and Title, Designer and Issued date.
The General Tab provides a place to record basic information about the Drawing Set, such as the Name, Title, Date and the Bid Package.
|
|