Oracle Primavera P6 Patch 16.2.7 Released

The latest patch for Primavera P6 is now available. Below are the issues that have been resolved with version 16.2.7.

WEB

25607708

P6 WEB RECALCULATES ASSIGNMENT COSTS RESULTS INCORRECT

25897583

ERROR WITH UPDATE EXISTING XML IMPORT [OBJECT OBJECT] - THIS IS A REQUIRED FIELD

25895582

UNDER RESOURCES TAB SEARCH FILTER IS NOT REMOVED

25886473

PROJECT CODES - WEB

25864136

NO ABILITY TO SELECT ALL FROM REPORTS IN P6

25841989

INTERNAL-FP:25797617:SERVER RETURNED HTTP RESPONSE CODE: 504 LOADING GLOBAL ACTI

25835069

COPY/PASTE AND LETTER V ARE NOT ACCEPTED IN RISK CATEGORY

25823565

ERROR "THE SELECTED DATES CREATE A GAP IN THE FINANCIAL PERIODS ... OCCURING

25806788

DBENGINE ERROR WHEN ENTERED VALUE IS MORE THAN MAXIMUM VALUE FOR RISK THRESHOLD

25802582

UNABLE TO IMPORT MSP XML WHEN NO TEMPLATES EXIST

25773235

CANNOT ADD PROJECT IN STANDARD VIEW

25756815

CHANGING ACTIVITY TYPE REMOVES ALL ACTIVITIES RELATIONSHIPS.

25742903

EPS GROUP BAND UDF DATE FIELDS BLANK OUT WHEN SWITCHING

25731219

USER ADMINISTRATION EXPORT CONTAINS TRAILING CHARACTER

25716178

PXRPTUSER.PROJECT.SUMACTUALFINISHDATE HAS VALUE WHEN

25713464

SET TIMESHEET MANAGER FOR RESEARCH FAILS WHEN THERE ARE MANY USERS

25690059

CANNOT DISPLAY PREDECESSOR OR SUCCESSOR COLUMNS

25661110

BASELINES NOT GETTING PUBLISHED TO WBSHIERARCHY TABLE

25449050

NOTEBOOK DESCRIPTION DOES NOT SUPPORT MULTI BYTE CHARACTERS

25359402

SUMMARY BAR SETTING IN STANDARD VIEW SETTING NOT WORKING PROPERLY.

25204899

PLANNED DURATION FOR RESOURCES ARE DISPLAYING VALUES BEHIND THE DECIMAL

 

INTG

25944061

FP: GATEWAY - P6 ADAPTER DOES NOT ALLOW WRITE ON "ACTIVITYSTEP FOR PROJECT

25702513

UDFVALUE UPDATE MESSAGES ARE NOT BEING GENERATED

 

SRVS

25581283

ROW LOCK `ENQ: TX - ROW LOCK CONTENTION' CAUSING PROJECT SUMMARIZATION SLOW

25565842

PUBLISH RESOURCE MANAGEMENT SERVICE FAILS WITH ERROR ORA-06502

25834626

FP :UPDATEBASELINEOPTIONSERVICE OPERATIONS ERROR 'OBJECTID IS NOT A VALID FIELD'

 

API

24968647

P6 API - ACTIVITY CREATE - INVALIDCLASSEXCEPTION: SERIALVERSIONUID MISMATCH

 

TM

25823581

TEAM MEMBER, STEPS ARE NOT SHOWN IN THE ORDER THEY ARE ADDED IN THE CLIENT

 

P6PRO

25290789

CVC-DATATYPE AND CVC-TYPE ERRORS STILL EXIST IN MSP XML EXPORT

25549475

ACTIVITIES DELETED FROM BASELINES DURING UPDATE

25797663

ERROR IMPORTING XLSX 'EST_WT COLUMN IS NULL' AFTER 16.2.5.0 UPGRADE

25916866

VISUALIZER - PERFORMANCE DEGRADATION WHEN DRAWING A SECOND TSLD WITH LINES

25911671

P6PRO CRASHES AFTER MOMENTARY NETWORK INTERRUPTION WITH CLOUDCONNECT

25888855

ISSUE WHILE RUNNING MULTIPLE REPORTS SECOND TIME/REPLACE OLD FILES

25888830

IMPORT XLS WILL DUPLICATE ROLE ASSIGNMENTS

25888799

CHANGES PICKED UP WHEN MERGING REFLECTION TO SOURCE WHEN NOTHING

25888603

SLOW DRAWING/SCROLLING OF PROJECT VIEW DUE TO DATABASE CALL FOR EACH ROW

25866662

INTERNAL PLUGINS FAIL WHEN USER EXISTS IN OU WHERE # IS FIRST CHARACTER OF OU

25862025

PROJECT ID CONTAINING FORWARD SLASH RESULTS IN XML EXPORT FAILURES

25852742

LAYOUTS BELONGING TO UNOPENED PROJECTS SHOWS UP IN OPEN LAYOUT DIALOG

25840073

INTERNAL-FP: 25091337: XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT

25823623

PHYSICAL % COMPLETE ENTRY IS SET TO 0% AFTER XML IMPORT INTO AN EPPM DATABASE

25822661

XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT

25815291

COPYING A CHECKED OUT PROJECT LEAVES THE RESULTING PROJECT CHECKED OUT

25808692

LOGIN ISSUE: APPLICATION AND DATABASE VERSIONS DO NOT MATCH ERROR

25759157

PERFORMANCE: DELETING A WBS CAUSES MANY INEFFICIENT CLOUDCONNECT REQUESTS

25700339

XML FILE CAN'T BE DOWNLOADED DUE TO '&' IN PROJECT NAME

25670568

INTERMITTENT AVAA0 ERRORS WHEN CHANGING LAYOUTS

25520960

ERROR ADDING EXTERNAL APPLICATION LINK TO TOOLS MENU FOR EPPM DATABASE

25333413

AFTER UPGRADE FROM 15.2 TO 16.2 P6 PROFESSIONAL IS NOT WORKING THROUGH SAML