IMPORTANT UPDATE: The major patch 20.12.12.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

33648691 RESOURCE USAGE PAGE NOT LOADING

33637402 DOWNLOAD FILE FROM NOTIFICATION WINDOW DOES NOT WORK WHEN ATTEMPTING TO DOWNLOAD A REPORT

33620576 CHANGES FOR NULL CHECKS AND MINOR OPTIMIZATION IN STATUS UPDATES PAGE

33493661 UNNECESSARY SERVER SIDE LOGGING WHEN SELECT ACTIVITY THAT DOESNOT HAVE RESOURCE ASSIGNMENT.

33596425 USING FILL DOWN IN P6 WEB TO UNCHECK ENABLE SUMMARIZATION PRODUCES SEVERAL POPUPS

33586021 PORTFOLIO VIEW SCORECARD PORTLETS FAILING TO LOAD WITH JAVA.LANG.NULLPOINTEREXCEPTION POST UPGRADE FROM 19.12.X

33557148 MODIFY 20.12.10 P6.EAR TO NOT CONTAIN PASSWORD ENCRYPTED FILES SO CUSTOMER'S SECURITY SCANS WILL PASS

33546654 GLOBAL SEARCH AND REPLACE ONLY USES FIRST VALUE IN THE COMMA SEPARATED VALUES

33513139 RESOURCE ASSIGNMENTS VIEW NOT GROUPING BY HIERARCHY IN P6 WEB

33512897 INCORRECT TIME IN MANAGE USER SESSIONS LAST ACTIVE TIME

33503584 TIMESHEET TOTALS IN P6 WEB NOT SHOWING TOTALS FOR FIRST OR LAST DAY OF TIMESHEET PERIOD

33463110 IN P6 WEB ACTIVITIES MULTIPLE ISSUES AFTER COPY AND PASTE EXISTING USER VIEW, AND AFTER ADDING FOOTER, PRINTING, AND RETURNING TO ACTIVITIES VIEW ERROR APPEARS

33388704 NULL FOR FINISHDATE IN P6BLPROJECT, NULL FOR STARTDATE AND FINISHDATE IN P6BLWBS

32959927 EXPORT LANGUAGE IS DIFFERENT THAN LANGUAGE SELECTED DURING LOGIN.

33236650 RESOURCE ASSIGNMENT SPREADS (NOT PERIOD ACTUALS) FOR BASELINES ARE NOT AVAILABLE

Team Member

33577050 FP USERNAME WITH Ü IN THE NAME CAUSES AUTHENTICATION FAILURE

33526581 FP TEAM MEMBER MANAGED SERVER(S) JVM PROCESS CONSUMING HIGH CPU AND MEMORY - CLEARENTITYMANAGER CHANGES

33517120 TEAM MEMBER LOGIN EXCEPTION ACCESSOR OR ITS CONNECTION HAS BEEN SET TO NULL.

33497408 STATUS UPDATES FOR REMAINING DURATION AND PERCENT COMPLETE RESETS ORIGINAL DURATION

P6PRO

33605141 AFTER THE UPGRADE USER CAN'T SELECT OPTION FROM PAGE SETUP.

33562945 VERTICAL SIGHT LINES ARE PLACED BETWEEN WEDNESDAY AND THURSDAY AFTER SETTING SHOW MAJOR LINES EVERY TO 7 DAYS

33559255 ACTIVITY USAGE SPREADSHEET PASTED INTO EXCEL DISPLAYS DATES BACK TO 00

33531488 INCORRECT RELATIONSHIPS BETWEEN TASK DEPENDENT AND FINISH MILESTONE

33576330 PERIOD DATA AT ACTIVITY LEVEL LOST WHEN COPY/PASTING PROJECT

33571422 IMPORT EXCEL XLSX FAILS WHEN UPDATING MILESTONES RELATIONSHIPS

33559964 CSTR_DATE: INVALID VALUE OR DATA TYPE MISMATCH ERROR WHEN TRYING TO IMPORT XLSX FILES IN P6 PROFESSIONAL

33555301 IMPORT / EXPORT REMAINING LAG FROM XLS DOESN'T WORK

33540032 TIME DISPLAYED IN FOOTER REVISION BOX EVEN WHEN TIME IS DISABLED IN USER PREFERENCES

33530312 INCORRECT NAME OF ACTIVITY TYPE = LEVEL OF EFFORT IN RUSSIAN

33433490 THE 'ACTIVITY RESOURCE ASSIGNMENTS' STAGE OF AN XER IMPORT TAKES ABOUT 80% OF THE TOTAL IMPORT TIME.

33332097 XML IMPORT IS VERY SLOW

32906183 BUDGETED COST IS NOT CORRECTLY CALCULATED FOR SMALL VALUES FOR BUDGETED UNITS/TIME SEV 1 SR

INTG

33623073 P6 WEB SERVICES READACTIVITIES FAILS WHEN INCLUDING BASELINE FIELDS

33585154 TEMPLATEWBSOBJECTID PARAMETER FROM PROJECTSERVICE > COPYWBSFROMTEMPLATE OPERATION ALLOWS A WBS_ID VALUE FOR AN EPS

33572823 INTERNAL-BP:P6 WS RESOURCE ASSIGNMENT SPREAD HAS INVALID DATA IN THE LAST BUCKET

33474369 PROJECT LASTUPDATEDATE HAS DIFFERENT VALUES BETWEEN P6 WEB SERVICES AND PDS / PX.

DB

33390934 GETTING ERROR WHILE UPGRADE DATABASE FROM 16 TO 20

ADMIN

33640462 UPGRADE SCRIPT MISSING LOGIC TO CREATE NDX_PROJWBS_1 AS A LOCAL INDEX IF PARTITIONING ENABLED