Skip to main content

Emerald Associates News

P6-Scrubber v7 - New Release

P6-Scrubber v7 - New Release

In version 7, we added support for scrubbing role codes, revamped the simple scrub dialog (and added new simple scrub areas), and added the ability to apply a dynamic prefix to both IDs and hierarchies in the simple scrub area.

Read more

P6-Loader v15 - New Release

P6-Loader v15 - New Release

In this release of P6-Loader v15, Emerald has added additional UDF merging options for better control. Layouts and filter controls have been greatly expanded, with a layout usage sheet and loader sheet to deal with user layouts. Resources can now be remapped when copying layouts.

Read more

CAPPS - v12 Release

CAPPS - v12 Release

Introducing CAPPS Version 12.0

Version 12 of CAPPS comes with a variety of new features and improvements, including greater grid functionality and adaptability, better clarity, and the addition of a baseline development tab.

Read more

Unifier v24 - New Release

Unifier v24 - New Release

The new Unifier v24.12 update adds significant new features and improvements to make the user experience smoother and easier, including changes to integration, documents and attachments, importing data, the mobile application, and many more.

Read more

P6 v24 - New Release

P6 v24 - New Release

With the new release of P6 v24 comes a flood of enhancements and new features that make P6 better and easier to use than ever! From a new, simple way to unlink your activities in P6 Client, to a whole new view for timesheets in Team Member, take a look at a few of our favorite new additions.

Read more

Upcoming Live Webinars

Upcoming Live Webinars

Upcoming Webinars - Register Now to Learn More!
  • P6-QA - June 11, 10-11am MDT
  • P6-Auditor - June 17, 10-11am MDT
  • Primavera P6 Overview - June 18, 10-11am MDT

Read more

P6-Loader v14 - New Release

P6-Loader v14 - New Release

Better resource assignment and unique loading options, record action column, and backup of layouts

Read more

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6, OPC or Safran Risk.
  • Primavera P6 Basics - Oct 28-Nov 1
  • Introduction to OPC - Nov 4-5
  • Primavera P6 Advanced - Nov 13-15

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

P6-Loader v12 - New Release

P6-Loader v12 - New Release

Our latest version of the P6-Loader brings the ability to automate the backups out of P6 even from the Oracle P6 Cloud.

Read more

PCM-Archiver v6.3 - New Release

PCM-Archiver v6.3 - New Release

PCM-Archiver version 6.3 adds support for Primavera Expedition.

Read more

P6-Reporter v3 - New Release

P6-Reporter v3 - New Release

More charts. More insight. Understand your projects in ready to use, customizable reports in Power BI, Tableau or ODV.

Read more

Oracle Primavera P6 19.12.19.1 Released

IMPORTANT UPDATE: The interim patch 19.12.19.1 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

34166644 XER IMPORT/EXPORT NOT IMPORTING OR EXPORTING CALENDAR EXCEPTIONS, NOTEBOOK DESCRIPTIONS WHEN DATA ELEMENT EXCEEDS 4096 CHARACTERS

Oracle Primavera P6 19.12.19.0 Released

IMPORTANT UPDATE: The major patch 19.12.19.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

33701453 19 BP - UPGRADE LOG4J JAR TO 2.17.1

32751746 HARD CODE HINTS TO PROJECT/PROJWBS/SUMTASK/GTT_PKLIST STATEMENT EXECUTED DURING ASSIGNMENT PAGE LOADING

INTG

33300301 THE LIVE SPREAD COMPUTING OF THE API CALCULATES WRONG VALUES

Team Member

33786943 FP - LOADING TEAM MEMBER USING NON-ENGLISH LOCALE PREVENTS TIMESHEET SUBMISSION DUE TO CLEAR ALL FILTERS POPUP

33800265 FP - TEAM MEMBER USING LANGUAGE OTHER THAN ENGLISH ARE NOT ABLE TO VIEW THE SAVE AND CANCEL BUTTONS DURING AFTER EDITING A TIMESHEET IN (NORMAL) 100% BROWSER (CHROME) ZOOM

33682563 TIMESHEET FILTER FEATURE - BACK PORTING CHANGES TO 19.12.X VERSION

SRVS

33787552 FP - P6 WS FAILS WITH ERROR THE MESSAGE CANNOT BE PROCESSED BECAUSE IT HAS EXPIRED

33749436 P6 WEB SERVICES FAILS TO UPDATE ACTIVITY RECORD UPDATE AFTER UPGRADE TO 19.12.16.0

P6PRO

33781634 COPY/PASTE A BIG PROJECT IS SLOW - SQL SERVER PPM DATABASE

33529640 IN PROJECT THRESHOLDS, UNDER DETAILS TAB, YEAR OF 'FROM DATE' & 'TO DATE' OPTIONS IS BEING DISPLAYED AS 1821 INSTEAD OF 2021 WHEN 4-DIGIT YEAR OPTION IS UNCHECKED

33760232 UNABLE TO DEFINE CRITICAL ACTIVITIES IN VISUALIZER

DBCONFIG

33458389 FP - UNABLE TO CONNECT DATABASELOGINS TOOL TO SQL SERVER WITH ENCRYPTED CONNECTION

Oracle Primavera P6 19.12.18.0 Released

IMPORTANT UPDATE: The major patch 19.12.18.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

33546468 REPORT WINDOWS (RUN REPORT, SCHEDULE DETAILS, ADD SCHEDULE) LEAKING CONNECTIONS WHEN EXECUTING REST CALL TO LOAD CONFIGURATION DATA

33498971 GLOBAL SEARCH AND REPLACE ONLY USES FIRST VALUE IN THE COMMA SEPARATED VALUES

33497009 IMPORTING PROJECT CODE FAILS WITH ERROR MAXCODELENGTH: MAX CHARACTER EXCEEDED

33463804 PRE- WHEN A TEXT WITH DIFFERENT FONT IS INSERTED IN THE HEADER OR FOOTER THE VIEW DOES NOT LOAD

33390566 COULD NOT FIND THE CONTEXT WBS FOR SECURITY CHECKING. {1} MIGHT NOT EXIST.

32758385 HTTP/2 PROTOCOL DOESN'T SUPPORT THE REASON PHRASES ANYMORE, CODE REFERENCES FOR RESPONSE.STATUSTEXT TO BE REMOVED/MODIFIED TO BE COMPATIBLE WITH HTTP2 PROTOCOL

33662939 DEBUG MODE NOT REFLECTING IN P6 FAMILY APPLICATION LOGS

33579475 IPMDAR ISSUES - BASELINE DURATION SHOULD BE NULL FOR NON MATCHING ACTIVITY

Team Member

33644196 PRE-NOT RECEIVING BUSINESS CARDS WHEN MULTIPLE UPDATES ARE MADE WITHOUT REFRESHING

33577033 FP USERNAME WITH Ü IN THE NAME CAUSES AUTHENTICATION FAILURE

33526561 FP TEAM MEMBER MANAGED SERVER(S) JVM PROCESS CONSUMING HIGH CPU AND MEMORY - CLEARENTITYMANAGER CHANGES

33517085 TEAM MEMBER LOGIN EXCEPTION ACCESSOR OR ITS CONNECTION HAS BEEN SET TO NULL.

33507841 FP - TIMESHEET SUBMISSION ERROR - TOTAL HOURS CANNOT EXCEED 24 HOURS PER DAY

33497262 STATUS UPDATES FOR REMAINING DURATION AND PERCENT COMPLETE RESETS ORIGINAL DURATION

SRVS

33384775 19 BP - P6 WS READJOBLOG DOES NOT RETURN XML LOG

33488700 19 BP - P6 EPPM WEB SERVICE EXPORT SERVICE DOES EXPORT XML FILE WITH CORRECT ENCODING

P6PRO

33623358 AFTER THE UPGRADE USER CAN'T SELECT OPTION FROM PAGE SETUP.

33594655 PERFORMANCE DEGRADATION LAUNCHING VISUALIZER DUE TO UDFVALUE QUERY (GLOBAL DATA LOADING)

33562946 VERTICAL SIGHT LINES ARE PLACED BETWEEN WEDNESDAY AND THURSDAY AFTER SETTING SHOW MAJOR LINES EVERY TO 7 DAYS

33559229 ACTIVITY USAGE SPREADSHEET PASTED INTO EXCEL DISPLAYS DATES BACK TO 00

33406073 LIOOB-1846-5 MESSAGE: LIST INDEX OUT OF BOUNDS (17)

33559968 CSTR_DATE: INVALID VALUE OR DATA TYPE MISMATCH ERROR WHEN TRYING TO IMPORT XLSX FILES IN P6 PROFESSIONAL

33555755 IPMDAR EXPORT: TASK FIELDS ARE NOT EXPORTED IN TASKS.JSON FILE

33555305 IMPORT / EXPORT REMAINING LAG FROM XLS DOESN'T WORK

33550989 TIME DISPLAYED IN FOOTER REVISION BOX EVEN WHEN TIME IS DISABLED IN USER PREFERENCES

33514509 ENABLE PUBLICATION SETTING IS DISABLED AFTER MERGING REFLECTION PROJECT INTO SOURCE PROJECT

33477388 EXTREMELY POOR PERFORMANCE WHEN EXECUTING GLOBAL CHANGE

33456386 EARNED VALUE TECHNIQUE ID NOT EXPORTING TO IPMDAR JSON AS EXPECTED FROM P6PRO FOR EPPM

33439749 HIGHLIGHTED PROJECT NOT SELECTED AFTER GOING TO FILE | OPEN

32906175 BUDGETED COST IS NOT CORRECTLY CALCULATED FOR SMALL VALUES FOR BUDGETED UNITS/TIME SEV 1 SR

31737280 ERROR EXPORT PROJECT XML

Oracle Primavera P6 19.12.17.0 Released

IMPORTANT UPDATE: The major patch 19.12.17.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

33433887 REPLACE BUTTON NOT WORKING WHEN IS EMPTY IS SELECTED UNDER DEFINE REPLACE CRITERIA IN GLOBAL SEARCH AND REPLACE

33430981 BP - CURRENT DURATION FIELD EXPORTED TO IPMDAR ARE NOT CORRECT

33430929 BP : EARNED VALUE TECHNIQUE ID NOT EXPORTING TO IPMDAR JSON AS EXPECTED

33424861 UNABLE TO LOAD DATA' ON P6 WEB ACTIVITIES VIEW

33387459 P6 EXPORT TO P6 XML CAUSES SIGNIFICANT LOB GROWTH

33248375 19 BP - STACKED HISTOGRAM IN RESOURCE ANALYSIS IS NOT SORTING ALPHABETICALLY

33218854 RESOURCES CAN COMPLETE ASSIGNMENTS CHECK DO NOT WORK

33206528 ERROR: ORA-01795: MAXIMUM NUMBER OF EXPRESSIONS IN A LIST IS 1000 WHEN COPY/PASTE PROJECTS

33199596 IN P6 WEB ACTIVITIES MULTIPLE ISSUES AFTER COPY AND PASTE EXISTING USER VIEW, AND AFTER ADDING FOOTER, PRINTING, AND RETURNING TO ACTIVITIES VIEW ERROR APPEARS

33185749 PUBLISHED BASE LINE NOT INSERTED THE DATA ROWS IN THE RESOURCEASSIGNMENTSPREAD TABLE.

31073630 SLOW PERFORMANCE OF LOADING STATUS UPDATES IN P6 WEB

INTG

33270117 FP - WHEN LOADING ACTIVITES USING P6 API ALL TASKRSRC FOR THE PROJECTS ARE LOADED DURING EACH BATCH

SRVS

33273477 FP PRIMAVERA WEB SERVICES SYNCHRONIZATION ERROR

P6PRO

33054840 XSLX EXPORT TEMPLATE DOES NOT HONOR SELECTED COLUMN ORDER

32873918 TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY

32709142 UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEARS IN THE FUTURE FOR CONSTRAINTS DATE DIALOG BOX

31556186 DATABASE UPGRADE DOESN'T KEEP THE ROW HEIGHT CHANGE TO GLOBAL ACTIVITY LAYOUT

33378204 IN P6 PROFESSIONAL ACTIVITIES LAYOUT IF GROUP AND SORT IS PRIMARY RESOURCE ANY COLLAPSED NODES ARE UNEXPECTEDLY EXPANDED AFTER LAYOUT SAVE OR SAVE AS

33317773 P6 EXPORT TO MS PROJECT XML PERFORMANCE AND SIGNIFICANT LOB GROWTH ISSUE

33210792 ACTIVITY CODES COLUMNS MISSING IN ACTIVITIES PAGE

33070074 AVAA ERROR WHEN USER ATTEMPTS TO 'ADD OR REMOVE BUTTONS' ON A TOOLBAR

33047978 MAINTAIN BASELINE WINDOW BECOMES HIDDEN WHEN ADDING BASELINE

33436347 ABILITY TO DELETE THE GLOBAL DEFAULT CALENDAR WITHIN P6 PROFESSIONAL WHILE ATTEMPTING TO DELETE UNASSIGNED PROJECT LEVEL CALENDAR

Oracle Primavera P6 19.12.16.0 Released

IMPORTANT UPDATE: The major patch 19.12.16.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

33165570 DURATION DOES NOT CHANGE WHEN DRAGGING ACTIVITY START ON GANTT CHART

33140229 EMAIL NOTICE SUBJECT DATES AUTOMATICALLY MOVE BACK ONE DAY FROM TIMESHEETS WHEN REJECTING TIMESHEETS

33139557 19 BP - GLOBAL CALENDARS ARE NOT SORTING PROPERLY IN ENTERPRISE DATA

33106454 ERROR: PRICEPERUNIT: CANNOT MODIFY PRICE/UNIT UNLESS RATE SOURCE IS CUSTOM WHEN RUNNING UPDATE BASELINE

33065158 DASHBOARD PORTFOLIO VIEWS GRAPHICS NOT DISPLAYING IN PRINT

33056988 19FP - IN P6 RESOURCES TAB ASSIGNMENTS PAGE WHEN A DIFFERENT VIEW IS SELECTED THE SAVE VIEW MESSAGE POPS-UP UNEXPECTEDLY

33053260 OAS :REPORT GENERATION ARE GETTING FAILED

33023194 INTERNAL-BP:REG: UPDATE BASELINE FAILS WITH ERROR PRICEPERUNIT: CANNOT MODIFY PRICE/UNIT UNLESS RATE SOURCE IS CUSTOM

32900791 INTERNAL-BP:PRE213- PERIOD ACTUAL UNITS ARE INCORRECTLY CALCULATED FOR A SCENARIO IN PROJ ASSIGNMENTS PAGE

32900419 INTERNAL-BP:PROJECT LEVEL COST DISCREPANCY BETWEEN ANALYTICS AND P6

32877915 19 FP - SQLSERVER: FILTER CRITERIA NOT DISPLAYING PROJECTS WHEN THE NUMBER OF EPS/PROJECTS EXCEEDS MAX SETTING

32671439 FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

31320456 P6 RESOURCEASSIGNMENT SERVICE ALWAYS RETURNS PRICEPERUNIT AS NULL VALUE FOR A ROLE

SRVS

33003631 BP - PROJECT SUMMARIZATION PERFORMANCE DEGRADATION WITH BASELINE COMPARISION SQL

33003598 BP - PROJECT SUMMARIZATION PERFORMANCE DEGRADATION

P6PRO

33178734 CHOOSING CUSTOM DATE FOR PAGE SETUP TIMESCALE DIRECTS TO YEAR 1899

33102358 CURTAINS ATTACHMENT NOT PRINTING OVERLAP IN PDF OR PRINT PREVIEW

31039542 PRINT FUNCTIONS ARE INTERMITTENTLY GRAYED OUT IN P6 PRO ON WINDOWS 2016

33189530 SEVERE DEGRADED PERFORMANCE SINCE APPLYING 19.12.15 FROM 19.12.13

33124357 IN P6 PRO DURING XER IMPORT IF A NON-DEFAULT IMPORT TEMPLATE IS SELECTED TO USE IT'S SELECTION IS NOT SAVED OFF.

33103888 ERROR: EVENT CODE: RRAGC-0089-9 WHEN LEVELING PROJECT

33102373 IN P6 PROFESSIONAL 'STATUS' VALUE IS MISSING FROM THE GROUP BY PICKLIST AND DOES NOT PRE POPULATE THE 1ST GROUP BY ROW WHEN CHOSEN

33025479 THE SCHEDULER PROCESS REQUIRES ADDITIONAL TIME TO COMPLETE - WHEN VIEW LOG FOR FAILED SCHEDULED SERVICE

33015676 SHOW GRAND TOTALS PREVENTS EMPTY EPS NODES FROM BEING DISPLAYED

33005983 ACTIVITIES ARE NOT IMPORTED WHEN IMPORTING PRIMAVERA XML FILE

32797717 SUMMARIZE PROJECT FAILED

32641730 SELECTING FINISH ON A STARTED ACTIVITY THEN MOVING THE FINISH DATE AHEAD CAUSES THE HH:MM TIME VALUE (16:00) TO REVERT TO MIDNIGHT (00:00)

32617677 FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

32527622 IN P6 PROFESSIONAL PAGE SETUP > OPTION TAB WHEN BREAK PAGE EVERY GROUP IS SELECTED BUT DISABLED RESULTS IN PAGE BREAKS AFTER EACH ACTIVITY ROW

32824832 ASSIGN GLOBAL ACTIVITY CODES IN P6 PRO TO ACTIVITIES - NOT RESPONDING

33086135 EXPORT PROJECT TO MICROSOFT PROJECT XML IS SLOW