P6-Scrubber v7 - New Release

P6-Scrubber v7 - New Release

In version 7, we added support for scrubbing role codes, revamped the simple scrub dialog (and added new simple scrub areas), and added the ability to apply a dynamic prefix to both IDs and hierarchies in the simple scrub area.

Read more

P6-Loader v15 - New Release

P6-Loader v15 - New Release

In this release of P6-Loader v15, Emerald has added additional UDF merging options for better control. Layouts and filter controls have been greatly expanded, with a layout usage sheet and loader sheet to deal with user layouts. Resources can now be remapped when copying layouts.

Read more

CAPPS - v12 Release

CAPPS - v12 Release

Introducing CAPPS Version 12.0

Version 12 of CAPPS comes with a variety of new features and improvements, including greater grid functionality and adaptability, better clarity, and the addition of a baseline development tab.

Read more

Unifier v24 - New Release

Unifier v24 - New Release

The new Unifier v24.12 update adds significant new features and improvements to make the user experience smoother and easier, including changes to integration, documents and attachments, importing data, the mobile application, and many more.

Read more

P6 v24 - New Release

P6 v24 - New Release

With the new release of P6 v24 comes a flood of enhancements and new features that make P6 better and easier to use than ever! From a new, simple way to unlink your activities in P6 Client, to a whole new view for timesheets in Team Member, take a look at a few of our favorite new additions.

Read more

Upcoming Live Webinars

Upcoming Live Webinars

Upcoming Webinars - Register Now to Learn More!
  • Emerald BI-GanttView - August 5, 10:30-11:30am MDT

Read more

P6-Loader v14 - New Release

P6-Loader v14 - New Release

Better resource assignment and unique loading options, record action column, and backup of layouts

Read more

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6, OPC or Safran Risk.
  • Primavera P6 Basics - Oct 28-Nov 1
  • Introduction to OPC - Nov 4-5
  • Primavera P6 Advanced - Nov 13-15

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

P6-Loader v12 - New Release

P6-Loader v12 - New Release

Our latest version of the P6-Loader brings the ability to automate the backups out of P6 even from the Oracle P6 Cloud.

Read more

PCM-Archiver v6.3 - New Release

PCM-Archiver v6.3 - New Release

PCM-Archiver version 6.3 adds support for Primavera Expedition.

Read more

P6-Reporter v3 - New Release

P6-Reporter v3 - New Release

More charts. More insight. Understand your projects in ready to use, customizable reports in Power BI, Tableau or ODV.

Read more

Oracle Primavera P6 20.12.7.0 Released

IMPORTANT UPDATE: The major patch 20.12.7.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

33053293 OAS :REPORT GENERATION ARE GETTING FAILED

33041114 THE PROJECT ARBITER FAILS AT 3:00 AM DAILY

33029042 BP-ON DELETING CODES/UDF/STEPS NOT DELETED FOR PUBLISED X TABLES

32988267 MISSING CAPTION IN APPLICATION SETTINGS FOR AUDITING

32982399 CLASSIC VIEW MIGRATION FAILED WITH ERRORS

32963106 DATA GETS PUBLISHED IN TO CHGMEMOX TABLE FOR ALL THE PROJECTS THOUGH ONLY SINGLE PROJECT IS PUBLISHED.

32958239 THE USER LOGIN REPORT SHOWS DIFFERENT VALUES UNDER APP_NAME SINCE UPGRADING TO V20.12.4

32936422 WHEN SWITCHING BETWEEN SECURITY PROFILES THE LOWER PERMISSIONS PANE ALSO CHANGES

32877925 20 FP - SQLSERVER: FILTER CRITERIA NOT DISPLAYING PROJECTS WHEN THE NUMBER OF EPS/PROJECTS EXCEEDS MAX SETTING

32876372 WHEN CREATING A NEW GLOBAL DASHBOARD FILTER,USERS RECEIVE THE ERROR: AN ERROR OCCURRED WHILE PROCESSING YOUR REQUEST.

31721941 VIEW SERVICE STATUS IMPORT JOB PROJECTS COLUMN SHOWING IMPORTING EPS NAME

32973049 P6 WEB SERVICES XML EXPORT FAILS WITH: FIELD FINANCIALPERIODTEMPLATEID HAS NOT BEEN LOADED OR SET.

32983183 ACTUALTHISPERIODCOST SET TO LARGE NEGATIVE VALUE WHEN CREATING NEW RESOURCEASSIGNMENTS

33012838 PRIMAVERA P6 IN AZURE - EXPORT PROJECT TO MICROSOFT PROJECT XML IS SLOW

32894598 VALIDATE.BAT, DATABASELOGIN.BAT & DBSETUP.BAT USING SSL PORT GOT ERROR : SQLRECOVERABLEEXCEPTION: IO ERROR: NO APPROPRIATE PROTOCOL ( PROTOCOL IS DISABLED OR CIPHER SUITES ARE INAPPROPRIATE), AUTHENTICATION LAPSE 0 MS

33001533 NEED TO REMOVE DROP SCRIPT IN GET_TASK_CODE_FOR_COPYWBS MSSQL PROCEDURE

32967352 AFTER EPPM UPGRADE FROM V.18.8 TO 20.12 USERS CANNOT COPY WBS COPY WBS FROM TEMPLATE WHEN PROJECT STATUS IS INACTIVE

32929634 COPY WBS FAILED WHEN COPYING A WBS FROM ANY PROJECT OR PROJECT TEMPLATE

P6PRO

33038664 P6 HANGS FOR MINUTES WHEN REFRESHING AFTER SUMMARIZING A PROJECT

32996852 TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY

32976471 WHILE SWITCHING FROM THE ACTIVITIES VIEW TO WBS VIEW, THE WBS SELECTED IN WBS VIEW IS NOT UPDATED

32801608 IMPORT XML PROCESS COMPLETED SUCCESSFULLY BUT NO PROJECT AND ERROR IN LOG

31514547 IN VISUALIZER TSLD LAYOUT FINISH DATE FILTERS ARE NOT WORKING AS EXPECTED

33030789 LOADING DATA SUMMARY AFTER MANUAL SUMMARIZATION IS TAKING A LONG TIME

32988936 PLANNED VALUE COST DIFFERS IN THE ACTIVITY USAGE SPREADSHEET AND THE ACTIVITY TABLE

32739773 ??INCORRECTRESULTSIZEEXPECTED1ACTUAL0?? INCORRECT RESULT SIZE: EXPECTED 1, ACTUAL 0 WHEN ATTEMPTING TO SAVE A COPY OF THE CURRENT SCHEDULE AS A NEW BASELINE

30505276 THE DATE ADDED IS TODAY'S DATE AND ADDED BY IS SYMON(BG)

32975530 BP - STORED IMAGES CANNOT LOAD AFTER MIGRATING DATABASE

Oracle Primavera P6 19.12.15.0 Released

IMPORTANT UPDATE: The major patch 19.12.15.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

32950357 BP OF BUG 32936422 - WHEN SWITCHING BETWEEN SECURITY PROFILES THE LOWER PERMISSIONS PANE ALSO CHANGES

32949812 BP - ALLOCATION NOT CORRECT IN OPEN REQUEST FOR RESOURCES PORTLET

32918176 19 BP - PRE- PORTFOLIO FILTERS ARE NOT SAVING WHEN A DATE FIELD WITH EQUALS OPERATOR IS APPLIED

32821575 P6 WEB CALENDAR DISPLAYED INCORRECTLY FOR 24X7 CALENDAR.

32809022 19 BP - REVOKING A USER'S TIMESHEET MODULE ACCESS WILL CLEAR OUT 'USES TIMESHEET' AND 'TIMESHEET APPROVAL MANAGER' CAUSING INCORRECT APPLY ACTUALS

32808564 19 BP - NO LOCATION FOUND WHEN ENTERING THE GEO COORDINATES

32786472 19 BP - SETTING TIME TO SHOW AS PERCENTAGE DOES NOT WORK, STILL SHOWING DATA AS SHOW AS UNIT/DURATION

32760625 ASSIGNMENTS PAGE P6/REST/ASSIGNMENTS/GRIDDATA/LOAD PROCESSES/SENDS PROJWBS/CALENDAR DATA FROM COLLECTIVE SESSIONS VERSUS THE VIEW BEING LOADED ON PAGE

32729208 SWITCHING FROM DEUTSCH TO ENGLISH WILL MAKE COLUMN NAMES BE DISPLAYED IN DEUTSCH

32718360 PERFORMANCE ISSUE FILTERING/GROUPING UNDER PROJECTS>EPS AFTER OPENING HUNDREDS OF PROJECTS

32713034 19 BP - FILTER CRITERIA CHANGING UNDER MANAGE PORTFOLIOS

32842012 FP - P6 WEB SERVICES XML IMPORT UPDATE EXISTING ERROR: PHYSICALPERCENTCOMPLETE: ACTIVITY PERCENT COMPLETE IS BASED ON ACTIVITY STEPS AND THEREFORE CANNOT BE MODIFIED

TS

32946259 19 BP - TIMESHEETS NOTES SHOW WRONG TIME - MISSING TIMEZONE IN DATE

SRVS

32969998 STRANGE DATA ROW IS GENERATED IN TABLE RESOURCEASSIGNMENTSPREAD

P6PRO

32873918 TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY

32809298 GETTING EVENT CODE WHEN WE TRY TO ADD ACTIVITY CODES AT EPS LEVEL WITH SQLSERVER DATABASE

32970123 EXPORTING PROJECT FILE SHOWS INVALID FORMAT.

32916897 EXTERNAL EARLY START DATE IS NOT POPULATING IN P6 V19.

32852444 PLANNED VALUE COST DIFFERS IN THE ACTIVITY USAGE SPREADSHEET AND THE ACTIVITY TABLE

32946074 19FP - BASELINE1 SPREAD DATA FOR P6 WEB SERVICES ACTIVITYSPREAD IS INCORRECT

Oracle Primavera P6 20.12.6.0 Released

IMPORTANT UPDATE: The major patch 20.12.6.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

32934025 BP - ALLOCATION NOT CORRECT IN OPEN REQUEST FOR RESOURCES PORTLET

32928082 BP - REMOVING CURRENT VIEW COLUMNS AND SAVE CHANGES NOT REFLECTED

32911837 20FP - SWITCHING FROM DEUTSCH TO ENGLISH WILL MAKE COLUMN NAMES BE DISPLAYED IN DEUTSCH

32902698 APPEARS POSSIBLE TO DELETE A PROJECT VIA P6 WEB EVEN IF SOMEONE ELSE HAS SAME PROJECT OPEN

32900793 INTERNAL-BP:PRE213- PERIOD ACTUAL UNITS ARE INCORRECTLY CALCULATED FOR A SCENARIO IN PROJ ASSIGNMENTS PAGE

32900405 INTERNAL-BP:PROJECT LEVEL COST DISCREPANCY BETWEEN ANALYTICS AND P6

32895781 DOCS: UNABLE TO ADD DOCUMENTS TO DOC FOLDERS FROM ACTIVITIES PAGE .

32871052 AUTO-NUMBERING NOT USED WHEN PASTING ACTIVITIES FROM ANOTHER PROJECT

32866172 DELETEPUBLISHDATA -DOESN'T DELETE THE RECORDS FROM CHGUDFVALUEX TABLE.

32841953 FP P6 WEB CALENDAR DISPLAYED INCORRECTLY FOR 24X7 CALENDAR.

32970015 STRANGE DATA ROW IS GENERATED IN TABLE RESOURCEASSIGNMENTSPREAD

32833853 DATA MISSING IN COLUMNS WHEN EPS VIEW IS LOADED

32798853 PRE- PORTFOLIO FILTERS ARE NOT SAVING WHEN A DATE FIELD WITH EQUALS OPERATOR IS APPLIED

32769012 WHEN ACCESSING THE WEB. ALL PAGES GIVE ERROR, PAGE UNRESPONSIVE

31954320 ASSIGN ROLE/RESOURCE DISABLED IN ACTIVITY DETAILS BUT NOT DISABLED IN CONTEXT MENU

Team Member

32946250 20 BP - TIMESHEETS NOTES SHOW WRONG TIME - MISSING TIMEZONE IN DATE

SRVS

32846495 20FP - BASELINE1 SPREAD DATA FOR P6 WEB SERVICES ACTIVITYSPREAD IS INCORRECT

32845663 DISSOLVE ACTIVITY WEB SERVICE IS NOT WORKING GENERAL ERROR

32818373 DISSOLVE ACTIVITY WEB SERVICE IS NOT WORKING IN SOME CASES

32855762 IMPORTSERVICE-> UPDATEEXISTING IS FAILING FOR PROJECT WITH BASELINES.

32841625 FP - BUG 32775117 - P6 WEB SERVICES XML IMPORT UPDATE EXISTING ERROR: PHYSICALPERCENTCOMPLETE: ACTIVITY PERCENT COMPLETE IS BASED ON ACTIVITY STEPS AND THEREFORE CANNOT BE MODIFIED

32946197 BP - PROGRAMMATICALLY HANDLE INSERT OF PROJECT ARBITER JOBSVC ROW IF PUBLICATION IS ENABLED BUT SOMEONE IMPROPERLY REMOVES ROW FROM JOBSVC

P6PRO

32775987 IMPORT XER: CALENDAR INSERT NEW IS NOT INCREMENTED PER THE EXISTING GLOBAL CALENDAR

32966465 ACTIVITIES NOT GROUPED CORRECTLY

32964462 GROUP SORT FUNCTION DOES NOT WORK AFTER UPGRADE

32811556 IN P6 RESOURCE ASSIGNMENTS VIEW, WHEN ADDING A FILTER WITH CRITERIA ACTUAL MATERIAL UNITS WILL RESULTS IN AN ERROR - '[QT_HOUR=###]' IS NOT A VALID FLOATING POINT VALUE'

32722565 PRIMARY CONSTRAINT HOUR FIELD NOT CHANGING IN ACTIVITY DETAILS LAYOUT

Oracle Primavera P6 20.12.5.0 Released

IMPORTANT UPDATE: The major patch 20.12.5.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

32832036 THE SCHEDULER PROCESS REQUIRES ADDITIONAL TIME TO COMPLETE - WHEN VIEW LOG FOR FAILED SCHEDULED SERVICE

32830051 RESOURCE PRICE/UNIT VALUE IS CHANGED WHEN THE DISPLAY CURRENCY SYMBOL IS CHANGED

32815639 IN P6 WEB APPROVALS TAB HANGS WHEN SELECTED SINCE UPGRADING FROM 20.12.2 TO 21.2

32773561 RESOURCE NOTES TEXT COLOR APPLIED IN PROFESSIONAL NOT DISPLAYED IN EPPM

32773456 DOWNLOAD LINK FROM P6 WEB CLIENT DOES NOT UPDATE AFTER EXPORT JOB COMPLETES SUCESSFULLY.

32759304 THE FINANCIAL PERIOD VALUE DOES NOT ADVANCE AFTER STORED PERIOD PERFORMANCE IS EXECUTED.

32757685 SETTING TIME TO SHOW AS PERCENTAGE DOES NOT WORK, STILL SHOWING DATA AS SHOW AS UNIT/DURATION

32739004 FP PORTFOLIO FILTERS NOT SAVING FOR IS UNDER AND NOT EQUAL TO CONDITION

32737850 EDIT FILTER TAB IS CLOSING IN EPS VIEW

32734514 CANNOT ASSIGN RESOURCE ASSIGNMENT CODE TO A RESOURCE ASSIGNMENT

32723412 THE APPLICATION DOES NOT DISPLAY THE INFORMATION CORRECTLY IN THE FIELDS PROJECT STATUS FROM COLUMNS AND FROM GENERAL TAB

32618959 PRIVILEGE REQUIRED FOR UDF ASSIGNMENT.AND EDIT UDF VALUE IN UDF DETAILED TAB

32756878 SERVICE LOG FILES SHOW IN UNFORMATTED XML WHEN INITIATED FROM P6 WEB BUT VIEWED FROM P6 PROFESSIONAL

32765759 DBENGINE.EXECUTESTATEMENT FOR {CALL PV_LOGIN(?, ?, ?, ?)} FAILED: NUMERIC OVERFLOW

32814362 Bug 32814362 - UNABLE TO UPGRADE 19.12.12 PMDB TO 20.12.0 -ALTER TABLE STATEMENTS FAILING

32828234 [ORACLE ONLY] INCLUDE PDS TRIGGER FILTER IN UPGRADE SCRIPT LOGIC THAT RE-ENABLES ALL TRIGGERS OWNED BY THE P6 EPPM SCHEMA

31577521 COPIED PROJECT RETAINING PROJECT ACTIVITY CODE FROM ORIGINAL CAUSING KEY NOT FOUND ERROR ALERT BOX TO DISPLAY

32677970 NO LOCATION FOUND WHEN ENTERING THE GEO COORDINATES

32738574 SR 3-25024826451: SPREAD DATA VALUES IS NOT COMING IN WEBSERVICE IN STAGE 20.12/BUG 32418691 - SPREAD DATA VALUES IS NOT COMING IN WEBSERVICE IN STAGE 20.12

32671449 FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

32422137 REVOKING A USER'S TIMESHEET MODULE ACCESS WILL CLEAR OUT 'USES TIMESHEET' AND 'TIMESHEET APPROVAL MANAGER' CAUSING INCORRECT APPLY ACTUALS

Team Member

32800103 UPDATES TO ACTIVITY UDF FIELDS IN TEAM MEMBER ARE NOT PUBLISHED TO THE EXTENDED SCHEMA

32377728 FOR CERTAIN TEAM MEMBER USERS AFTER LOGIN THEIR MY ACTIVITIES PAGE NEVER LOADS AND KEEPS SHOWING 3 SPINNING DOTS

SRVS

32768018 20BP - ACTIVITYSPREAD SHOWS INCORRECT VALUES WHEN INCLUDING BASELINES

32713519 FP RISKS ARE NOT COPIED WHEN USING P6 WEB SERVICES COPYPROJECT

32808919 BUG 31136153 - P6 RESOURCEASSIGNMENT SERVICE ALWAYS RETURNS PRICEPERUNIT AS NULL VALUE

P6PRO

32787953 USER WITHOUT UPDATE PRIVILEGE OF TEMPLATE CAN CHANGE TEMPLATE AFTER RENAME IT

32757624 PERFORMANCE DEGRADATION WITH ACTVCODE STATEMENT WHEN USING 'VIEW ALL DATA' STARTUP FILTER OR DISPLAYING ALL VALUES WITHIN ACTIVITY CODE WINDOW

32749704 SLOW PERFORMANCE OF EXPORTING SPREADSHEET XLSX

32731637 XLSX IMPORT PERFORMANCE IMPROVEMENT

32787985 THE SEQ_NUM ON TWO DIFFERENT CHILD WBS RECORDS, UNDER THE SAME PARENT WBS, IS DUPLICATED

32751789 GLOBAL CHANGE UPDATING UDF DATE TO NULL INSTEAD OF DELETING ROW

32750482 P6 PROFESSIONAL HANGS ON RELATIONSHIPS TO EXTERNAL PROJECTS IMPORTING LARGE XER FILE

32554709 ASSIGN GLOBAL ACTIVITY CODES IN P6 PRO TO ACTIVITIES - NOT RESPONDING

Oracle Primavera P6 20.12.4.0 Released

IMPORTANT UPDATE: The major patch 20.12.4.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

32698883 FP - VIEW GROUPING DIFFERENT BETWEEN VERSION 19 AND VIEW FROM VERSION 16

32693847 INCOMPLETE URL REFER TO YOUR WELCOME EMAIL FOR THE URL IN DASHBOARD-RISKS TAB

32673711 20FP - IN P6 WEB IF THE USER EDITS THE DURATION FORMAT FROM DAY TO HOUR THIS CHANGES THE ASSIGNMENT'S PRICE / UNIT ($8.00/D) TO $1.00/H

32643657 20 BP - ACTIVITY AND EPS VIEW THEME SETTINGS DO NOT SAVE (CUSTOM COLORS)

32642689 DASHBOARD PORTFOLIO VIEW SCORECARD PORTLET PERFORMANCE PERCENT COMPLETE NOT SUMMARIZING AS EXPECTED

32641922 REPETITIVE SQL EXECUTED ONE TIME PER PORTFOLIO DEGRADING OVERALL PERFORMANCE LOADING 'MANAGE PORTFOLIO' WINDOW

32636719 FP - TIMESHEET APPROVAL TAKES TOO LONG TO LOAD AND BECOME UNRESPONSIVE

32630562 FP DIFFERENT BEHAVIOR IN PRO CLIENT / WEB WHEN CHANGING START DATE ON ACTIVITY

32622727 FP - ADD/EDIT/DELETE RESOURCE ASSIGNMENTS FOR RESOURCE PLANNING STILL DISPLAYS IN ASSIGNED PRIVILEGES COLUMN AFTER UPGRADE

32612956 OUTPUT FORMAT DROPDOWN IS BLANK IN P6 FOR SPECIFIC REPORT TEMPLATE

32607435 COPY PROJECT TO CREATE NEW PROJECT- DOES NOT USE PROJECT PLANNED START DATE FOR NEW PROJECT

32603405 RESOURCE SEARCH DOES NOT WORK FROM OPEN REQUESTS FOR RESOURCES PORTLET IN DASHBOARD

32591330 FP - P6 EPPM MIGRATE.BAT LOGFILE - LOG LEVEL

32576631 FILTER CRITERIA CHANGING UNDER MANAGE PORTFOLIOS

32487403 FP - MIGRATING LARGE DATABASE - MIGRATE TOOL HANGS - DOES NOT LAUNCH

Team Member

32654823 GROUPING ACTIVITIES BY WBS IN TEAM MEMBER NOT CORRECTLY DONE

32642884 ERROR DATE OR UNIT FORMAT SPECIFIED WAS INVALID OR MISSING WHEN TRYING TO UPDATE ACTIVITY STATUS USING EAMIL STATUSING SERVICE

SRVS

32712018 FP PROJECT CODE/UDF ASSIGNMENTS GET MISSING AFTER IMPORTING XML FILE

32622550 20FP - P6 SERVICES SCHEDULING LOGIC CAN SET WBS SUMMARY ACTIVITIES TO AN IN-PROGRESS STATUS WITHOUT AN ACTUAL START DATE

32564695 FP- TASK_COPY_PKG.TASKPRED_COPY PACKAGE PROCEDURE CAN RUN SLOWLY WHEN OPTIMIZER USES HASH JOIN

32574050 STATUS REVIEWER IN PROJECT SERVICE CANNOT BE SET

INTG

32647746 FP - PRIMAVERA GATEWAY RESOURCE ASSIGNMENT UPDATE ISSUE

32694830 FP - ERROR ILLEGAL CHARACTER ((CTRL-CHAR, CODE ##)) INVOKING THE IMPORTSERVICE USING ZIP FORMAT WHEN PROJECT DATA INCLUDES CERTAIN UNICODE DASH CHARACTERS

32635938 FP FOR BUG 32469119 - ERROR ILLEGAL CHARACTER ((CTRL-CHAR, CODE ##)) INVOKING THE IMPORTSERVICE USING ZIP FORMAT WHEN PROJECT DATA INCLUDES CERTAIN UNICODE CHARACTERS

P6PRO

32662702 CHANGING ACTIVITY CALENDAR TO A CALENDAR WITH NON-WORK TIME CAUSES RESOURCE ASSIGNMENT DURATION TO SET TO 0

32650039 THE CONVERSION OF A VARCHAR DATA TYPE TO A DATETIME DATA TYPE RESULTED IN AN OUT-OF-RANGE VALUE

32606566 ACTIVITIES ARE MOVED TO AN EPS FROM ITS ORIGINAL WBS NODE AFTER MODIFYING THE ACTIVITY RELATIONSHIP

32606334 WHEN ASSIGNING RELATIONSHIPS, FOCUS MOVES TO ASSIGNED ACTIVITY

32605057 CHOOSING CUSTOM DATE FOR PAGE SETUP TIMESCALE DIRECTS TO YEAR 1899

32598730 P6 CLIENT LOGIN FAILING WITH ERROR 'UNABLE TO CONNECT DATABASE'

32565894 NOTEBOOK TOPIC DISPLAYS TEXT AFTER APPLYING FILTER, THEN OPENING UP A DIFFERENT PROJECT

32648631 RESOURCE ASSIGNMENT LAYOUT SHOWS DASHES INSTEAD OF NUMBERS AT SUMMARY LEVEL WHEN PRINTING

32618834 INDICATOR ICON IN COLUMN NOT DISPLAYING CORRECTLY

32617682 FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

32591422 P6 PRO AND P6 WEB INVALID RELATIONSHIP TYPES

32586297 ERROR SAVING MODIFIED UN/CEFACT XML TEMPLATE <DATE>T<TIME> IS NOT A VALID DATE/TIME VALUE

32532931 UNABLE TO RUN P6 PROFESSIONAL REPORTS IN PRODUCTION

32517551 ACTIVITY CODE ASSIGNMENT/REMOVAL ISSUE

32108186 P6 PROFESSIONAL VIA CLOUDCONNECT: UNABLE TO CONNECT TO THE DATABASE. PLEASE RUN THE DATABASE CONFIGURATION TOOL OR CONTACT YOUR ADMINISTRATOR.

32652945 IMPORTING XER FILE TRUNCATES FRONT OF NAME

32604136 EXPORT LAYOUT FROM VISUAIZER FAILS WHEN THE LAYOUT NAME CONTAINS A FORWARD OR BACKWARD SLASH