Oracle Primavera P6 21.12.7.0 Released
            
                            
IMPORTANT UPDATE: The major patch 21.12.7.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.
34327128 INTERNAL-FP:RESOURCE ANALYSIS - COLOR ASSIGNED IN LEGEND DOES NOT MATCH CHARTS
34310611 SLOW PERFORMANCE WHEN RUNNING MIGRATE.BAT (USING EITHER DATABASE MIGRATION OR SCHEMA MIGRATION OPTIONS) TO A SQL SERVER TARGET DATABASE- 21.12.X
34214389 21 FP - PRE-SEARCH FOR ISSUE CODE VALUES NOT WORKING IN ISSUES VIEW
34214373 21 FP - CORRUPTION / HTML REPLACEMENT DURING DOWNLOAD OF QUOTATION CHARACTERS FROM ISSUES PAGE (DESCRIPTION)
33963723 ADD PROJECT FROM EXISTING PROJECT AND PASTING INTO SAME OR DIFFERENT EPS NODE RESULTS IN ONE SPECIFIC ACTIVITY CODE (KPI) NOT BEING COPIED
34284007 21 BP - REJECTED STATUS UPDATE DOES NOT DISPLAY IN ACTIVITY OWNER'S ACTION REQUIRED TAB IF UPDATE WAS FOR AN ACTIVITY RESOURCE ASSIGNMENT AND PROJECT ONLY HAS THE ACTIVITY LEVEL STATUS UPDATE PREFERENCE ENABLED
34203009 21 BP - LOADING APPROVAL PAGE WITHIN P6 MOBILE CAUSING FORCEFUL LOGOUT WHEN TEAM MEMBER STATUS REVIEWS ARE ENABLED FOR A PROJECT WITHOUT ASSIGNED REVIEWERS
34072773 LOADING ACTIVITIES AFTER TEAM MEMBER LOGIN TAKES LONGER TIME
34060167 PROJECT PUBLICATION NOT HONORING THE PUBLICATION PERIOD START DATE AND ROLLING FINISH DATE FOR STORING TIME-DISTRIBUTED DATA
34288738 BP - BUG 34260961 - VARIOUS TYPOS ON FIELD NAMES THROUGHOUT OPENAPI.JSON
34209634 FP - USING P6 WS CANNOT CREATE A UDF ON AN ACTIVITY STEP TEMPLATE ITEM
34327217 INTERNAL-FP:WHEN USING THE RESOURCE ANALYSIS TAB IN P6 EPPM WEB, THERE IS A DELAY IN DELETING A NAME THAT WAS FOUND USING GROUP BY RESOURCE CODE AND NAME
34282922 GLOBAL CALENDAR LINKS TO DEFAULT CALENDAR CHECK-OUT/CHECK-IN PROCESS
34282787 BASELINE IS NOT UPDATING AS EXPECTED
34232093 UNABLE TO CHANGE RESOURCE CODE VALUE FROM DETAILS PANEL->CODES TAB
34209123 21 FP - USER UNABLE TO IMPORT THE XML FILE
34201113 P6 XML IMPORT RESULTING IN FAILED IMPORT JOB AND VIEW LOG ERROR SEVERE: ROW NUMBER IS OUT OF THE RANGE(1)
33957538 XLS IMPORT ADDS NEW RESOURCE WHEN RESOURCE ID IS NUMERIC WITH HEIRARCHY
34316758 BUG FIXES AND ENHANCEMENTS FOR 21.12.7.0
        
        
        
                WEB
34329392 USER IS ABLE TO WITHDRAW THE APPROVED TIMESHEET IN TM34327128 INTERNAL-FP:RESOURCE ANALYSIS - COLOR ASSIGNED IN LEGEND DOES NOT MATCH CHARTS
34310611 SLOW PERFORMANCE WHEN RUNNING MIGRATE.BAT (USING EITHER DATABASE MIGRATION OR SCHEMA MIGRATION OPTIONS) TO A SQL SERVER TARGET DATABASE- 21.12.X
34214389 21 FP - PRE-SEARCH FOR ISSUE CODE VALUES NOT WORKING IN ISSUES VIEW
34214373 21 FP - CORRUPTION / HTML REPLACEMENT DURING DOWNLOAD OF QUOTATION CHARACTERS FROM ISSUES PAGE (DESCRIPTION)
33963723 ADD PROJECT FROM EXISTING PROJECT AND PASTING INTO SAME OR DIFFERENT EPS NODE RESULTS IN ONE SPECIFIC ACTIVITY CODE (KPI) NOT BEING COPIED
Team Member
34302435 ERROR COM.FASTERXML.JACKSON.CORE.JSONPARSEEXCEPTION: INVALID UTF-8 START BYTE 0XB4 WHEN TRYING TO MARK A STEP COMPLETE34284007 21 BP - REJECTED STATUS UPDATE DOES NOT DISPLAY IN ACTIVITY OWNER'S ACTION REQUIRED TAB IF UPDATE WAS FOR AN ACTIVITY RESOURCE ASSIGNMENT AND PROJECT ONLY HAS THE ACTIVITY LEVEL STATUS UPDATE PREFERENCE ENABLED
34203009 21 BP - LOADING APPROVAL PAGE WITHIN P6 MOBILE CAUSING FORCEFUL LOGOUT WHEN TEAM MEMBER STATUS REVIEWS ARE ENABLED FOR A PROJECT WITHOUT ASSIGNED REVIEWERS
34072773 LOADING ACTIVITIES AFTER TEAM MEMBER LOGIN TAKES LONGER TIME
SRVS
34277813 FP - BUSINESS FLOW MIGRATE PROJECT DATA FROM P6 TO PRIMAVERA CLOUD FAILS DUE TO SPECIAL CHARACTER34060167 PROJECT PUBLICATION NOT HONORING THE PUBLICATION PERIOD START DATE AND ROLLING FINISH DATE FOR STORING TIME-DISTRIBUTED DATA
INTG
34288790 BP BUG FOR - BUG 34260380 - ESCAPE CHARACTERS FOUND WITHIN OPENAPI.JSON FIELD DESCRIPTION34288738 BP - BUG 34260961 - VARIOUS TYPOS ON FIELD NAMES THROUGHOUT OPENAPI.JSON
34209634 FP - USING P6 WS CANNOT CREATE A UDF ON AN ACTIVITY STEP TEMPLATE ITEM
P6PRO
33923028 ENDING WITH ACTIVITY SELECTED FOR CALCULATE MULTIPLE FLOAT PATHS RETAINED AFTER CHANGING DEFAULT PROJECT34327217 INTERNAL-FP:WHEN USING THE RESOURCE ANALYSIS TAB IN P6 EPPM WEB, THERE IS A DELAY IN DELETING A NAME THAT WAS FOUND USING GROUP BY RESOURCE CODE AND NAME
34282922 GLOBAL CALENDAR LINKS TO DEFAULT CALENDAR CHECK-OUT/CHECK-IN PROCESS
34282787 BASELINE IS NOT UPDATING AS EXPECTED
34232093 UNABLE TO CHANGE RESOURCE CODE VALUE FROM DETAILS PANEL->CODES TAB
34209123 21 FP - USER UNABLE TO IMPORT THE XML FILE
34201113 P6 XML IMPORT RESULTING IN FAILED IMPORT JOB AND VIEW LOG ERROR SEVERE: ROW NUMBER IS OUT OF THE RANGE(1)
33957538 XLS IMPORT ADDS NEW RESOURCE WHEN RESOURCE ID IS NUMERIC WITH HEIRARCHY
34316758 BUG FIXES AND ENHANCEMENTS FOR 21.12.7.0
- Last updated on .