Skip to main content

Emerald Associates News

P6-Loader v14 - New Release

P6-Loader v14 - New Release

Better resource assignment and unique loading options, record action column, and backup of layouts

Read more

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6, OPC or Safran Risk.
  • Primavera P6 Application Administration- Oct 16-17
  • Managing Risk in Safran Risk - Oct 21-24
  • Primavera P6 Basics - Oct 28-Nov 1

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

P6-Loader v12 - New Release

P6-Loader v12 - New Release

Our latest version of the P6-Loader brings the ability to automate the backups out of P6 even from the Oracle P6 Cloud.

Read more

PCM-Archiver v6.3 - New Release

PCM-Archiver v6.3 - New Release

PCM-Archiver version 6.3 adds support for Primavera Expedition.

Read more

P6-Reporter v3 - New Release

P6-Reporter v3 - New Release

More charts. More insight. Understand your projects in ready to use, customizable reports in Power BI, Tableau or ODV.

Read more

PCM-Archiver v6.1 - New Release

PCM-Archiver v6.1 - New Release

PCM-Archiver version 6.1 gives you better control than ever over the archived file and folder names.

Read more

Safran Risk v21 - New Release

Safran Risk v21 - New Release

Safran Risk has released v21. Read about all the exciting new features.

Read more

P6-Scrubber v4 - New Release

P6-Scrubber v4 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 4 makes scrubbing files even easier for schedulers.

Read more

PCM-Archiver v6 - New Release

PCM-Archiver v6 - New Release

PCM-Archiver version 6 allows you to save even more time when resuming previously-interrupted extractions.

Read more

P6-QA v7 - New Release

P6-QA v7 - New Release

Our latest version of P6-QA brings specific highlights to the GOA and Naval Air Scheduling quality standard metrics.

Read more

PCM-Archiver v5 - New Release

PCM-Archiver v5 - New Release

Our latest version of PCM-Archiver makes it easier than ever before to extract projects from PCM.

Read more

Oracle Primavera P6 18.8.10.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.10.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29825647 USESSAUD KEEPINTERVAL DISPLAYS INCORRECTLY IN P6 APPLICATION SETTINGS WHEN OTHER KEEPINTERVAL SETTINGS EXIST
  • 29776573 P6 WEB PROJECT PREFERENCES HANGS FOR PROJECT INTEGRATED WITH UNIFIER
  • 29746393 UPDATING FIELD ACTIVITYOWNERUSERID FAILED FOR ACTIVITY <ACTIVITY ID> IN PROJECT <PROJECT ID> BECAUSE FOR INPUT STRING:
  • 29686772 P6 WEB RISKS COST COLUMN SHOWS DOLLAR SIGN NO MATTER WHICH CURRENCY IS SELECTED
  • 29516628 REMAINING DURATION CHANGES WHEN IMPORTING VIA XML
  • 29438077 P6 WEB SAVE TO PDF IS FAILING WITH MULTIPLE ERRORS
  • 29361393 SQL SERVER IMPLEMENTATION OF BUG 27629063 - PX SERVICE ON RSRCROLEASGNMENTSPREAD TABLE
  • 26973761 AF-1683 - SAVE TO PDF BUTTON GREYED OUT IN EPPM PRINT
  • 29837323 IN EXCHANGE DATA MENU GATEWAY INTEGRATIONS ARE ORDERED DIFFERENTLY IN P6 WEB VS CLIENT
  • 29820167 UPGRADE/MIGRATION SCRIPTS REFERENCE DBMS_REPUTIL.FROM_REMOTE WITHOUT IF/ELSE STATEMENT

P6 CLIENT

  • 29804314 HINT HELP POP UP DOES NOT DISPLAY IF LOGGED IN WITH NON-ENLGISH LANGUAGE
  • 29664685 P6PROCLOUDCONNECT 18.8.7.0 THROWS INVALID DATABASE ERROR TRAVERSING PROXY WITH EXCLUSIONS
  • 29548077 PRINTING TO XPS ONLY PRINTS IN PORTRAIT
  • 29854012 FP WHEN ATTEMPTING TO IMPORT A MICROSOFT XML INTO P6 CONFIGURED FOR GERMAN REGIONAL SETTINGS WITH A IMPORT TEMPLATE CREATED IN GERMAN, IMPORT FAILS THE FOLLOWING
  • ERROR OCCURS IN THE LOG FILE
  • 29803683 ACTUAL THIS PERIOD DOES NOT UPDATE WHEN ACTIVITY STATUSED
  • 29661818 MERGING REFLECTIONS CAUSES UNIFIER PROJECT SETTINGS AND CBS CODES TO BE LOST
  • 29624860 ERROR: EVENT CODE AVAA0-0464-4 WHEN ASSIGNING PRIMARY RESOURCE TO MILESTONE

TEAM MEMBER

  • 29859886 P6 MOBILE LOGIN FAILS ON IOS DEVICES WHEN PORT 443 IS INCLUDED IN HTTPS URL
  • 29790522 TIMESHEET ENTRY FIELDS DISABLED WHEN MANUALLY ADDING ACTIVITIES

SRVS

  • 29835168 FP - BUG 29564582 - IMPORTPROJECTASYNCASAP DOES NOT WORK WITH GZIP OR ZIP FILE TYPE
  • 29795559 FP BUG-BUG 29725230 - JAVA.LANG.OUTOFMEMORYERROR: JAVA HEAP SPACE WHEN EXPORTING LARGE PROJECT USING P6 WEB SERVICES

Oracle Primavera P6 18.8.9.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.9.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29707616 EPS ACTIVITY CODE NOT SHOWING VALUES IN ENTERPRISE DATA BUT SHOWS IN PROFESSIONAL
  • 29698765 INCONSISTENT RESULTS CLICKING CODE VALUE THEN HIT DELETE TO REMOVE SELECTION
  • 29675193 P6 PRO CLIENT LIVE DATA VS WEB DATA DISCREPANCIES-WEB FIXES
  • 29675107 PATCH INQUIRY: PATCH SET 16.2.13.0 VS. PATCH SET 18.8.2.1
  • 29668954 RESOURCE REQUEST DETAILS DO NOT DISPLAY CORRECTLY ON IE11
  • 29654254 FP REPORTS STUCK IN THE RUNNING STATUS WHEN RUN FROM P6WEB.
  • 29635496 UNITS FOR MATERIAL RESOURCES ARE CONVERTED TO DURATION UNITS (DAYS) IN THE P6 WEB ASSIGNMENTS VIEWS
  • 29620622 'LOGIN LOCKOUT DURATION' DOES NOT WORK
  • 29598403 DISSOLVE OPTION ENABLED FOR USERS WITHOUT DELETE ACTIVITY PRIVILEGE
  • 29595446 FP - BUG 28718772 - 'INVALID PATH WAS REQUESTED' WHILE CLICK VIEW LOG IN NOTIFICATION BOX
  • 29590436 P6 WEB 'ALL PROJECTS USE THEIR OWN DATA DATE' SETTING NOT SAVED
  • 29587967 GROUPING BY PROJECT USING DESCENDING DOES NOT WORK.
  • 29460126 NEW COST IMPACT BY VALUE RISK THRESHOLD CANNOT SAVE
  • 29449526 CIRCULAR RELATIONSHIP ERROR WHEN CREATING FIRST PRED LINK TO START MILESTONE
  • 29154039 REPORTS DISPLAYING IN P6 OUTSIDE OF PROPER FOLDER
  • 28993855 FILTER CHANGES NOT SHOWING UNTIL MANUAL REFRESH

P6 CLIENT

  • 29712512 SQLITE PPM IMPORT XML ERROR OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT
  • 29671011 ERROR: OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT. IMPORTING MSP XML
  • 29653189 LEVELING PRIORITY OPTION IS NOT CORRECTLY IMPORTED FROM XER FILE
  • 29652900 COPYING RESOURCE USAGE SPREADSHEET DATA FROM ACTIVITIES VIEW PASTES 14 COLUMNS TO EXCEL
  • 29652881 JAPANESE ACTIVITY CODE CANNOT IMPORT INTO P6 WHEN CHANGING ACTIVITY CODE ORDER
  • 29353658 DUPLICATE RECORDS IMPORTED INTO PROJWBS
  • 29653207 FILTERS THAT USE TYPE-IN INFO PULLS UP A PICKER BOX INSTEAD OF MANUAL TYPE
  • 29652954 ERROR CONVERTING DATA TYPE NVARCHAR TO NUMERIC
  • 29413245 HANGS AT CLEANING UP WBS.... 30% WHEN IMPORT XER
  • 29688598 P6 PROFESSIONAL SQLITE DATABASE IMPORTING MSP XML FILES DROPS ALL RELATIONSHIP TYPES
  • 29715534 ORA-06502: PL/SQL: NUMERIC OR VALUE ERROR: INVALID LOB LOCATOR SPECIFIED: ORA-22275 WHEN USING DBSETUP
  • 29636489 ADJUST USESSION_CLEANUP TO TIMEOUT WHEN UPDATING ROWS LOCKED BY ANOTHER PROCESS

TEAM MEMBER

  • 29746501 TEAM MEMBER ASSIGN TASKS GETS TEAMMEMBER_ERROR_GENERIC
  • 29675837 IRREGULAR BEHAVIOR WHEN UPDATING ACTIVITIES IN TEAM MEMBER
  • 29426021 FP BUG-BUG 29235741 - TIMESHEETS ALLOWED TO BE SUBMITTED WITH NO ENTRIES OR WITH ZERO HOURS

SRVS

  • 29626309 FP BUG 29556756 - BO EXCEPTIONS NOT HANDLED PROPERLY IN UPDATE BASELINE
  • 29603337 FP BUG -BUG 29050757 - WEB SERVICE INITIATED SCHEDULE JOB HANG
  • 29591128 COPY/PASTE CREATES NEW PROJECT TASK_IDS IN DESCENDING ORDER COMPARED TO SOURCE
  • 29715183 IMPORT CODE NO LONGER WORKS AFTER UPGRADING FROM 18.8.3 TO 18.8.8
  • 29586215 P6WS NAMESPACE PREFIX WAS CHANGED FROM HTTP TO HTTPS

Oracle Primavera P6 18.8.8.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.8.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29607835 AF-2235-SWEDISH CHARACTERS REMOVED FROM PDF EXPORT
  • 29507043 P6 WEB ACTIVITY PAGE FAIL TO LOAD WHEN SHOW FIELD ROLLUPS ENABLED IN GROUPING
  • 29501722 P6 WEB RESOURCE ANALYSIS ERROR 'UNABLE TO LOAD ANALYSIS PICKER DATA'
  • 29413210 IMPORT XML IN P6 R18.8 WEB WITH SQL SERVER DB FAILS WHEN PROJECT ID CONTAINS CLOSING SQUARE BRACKET
  • 29380445 WEB DASHBOARD PORTLET IS NOT DISPLAYING ROLLUP DATA
  • 29349346 USER PORTFOLIO CANNOT BE SELECTED AS A DASHBOARD FILTER

P6 CLIENT

  • 29511866 PM.EXE IS NOT RESPONDING WHEN IMPORTING THE LARGE SPREADSHEET XLSX
  • 29489026 UNABLE TO EXPORT OR IMPORT XLSX COST ACCOUNT HIERARCHY CORRECTLY
  • 29468671 XML IMPORT FAILES WITH SEVERE: FOR INPUT STRING: 6.000 JAVA.LANG.NUMBERFORMATEXCEPTION
  • 29445474 IMPORT MSP XML (THAT WAS EXPORTED FROM P6) ERROR INTO P6 PPM WITH MSSQL DATABASE (NOT SQLITE)
  • 29322523 PROJECT AUTOMATICALLY DELETED WHEN IMPORTED A .XER PROJECT
  • 29312308 XML IMPORT => OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT.
  • 28895257 XML IMPORT FAILS WITH PRISM.MODULARITY.MODULEINITIALIZEEXCEPTION: AN EXCEPTION OCCURRED WHILE INITIALIZING MODULE 'COMMANDLINEMODULE'.
  • 28042419 VISUALIZER LAYOUT DISPLAYS INCORRECTLY FOR MANY USERS
  • 29596670 SQL SERVER DATABASE LOCKS CAUSING USER WAITS
  • 29551315 FP-BUG 29028404 - XML IMPORT FILE SIZE LIMIT / XML BLOATING
  • 29549937 WHEN CREATING A BASELINE OR COPY THE EXISTING PROJECT IT REMOVES ALL OF THE ACTIVITIES
  • 29440488 UNABLE TO COMMUNICATE WITH THE SERVER. APPLICATION WILL TERMINATE NOW - NO CLIENT-SIDE CACHE
  • 20611641 INTEGRITY CHECK #117 NOT REALLY A FOREIGN KEY VIOLATION
  • 29502396 ERROR: ONLY ONE DRIVING PROJECT IS PREMISSIBLE PER FILE. IMPORTING XML PROJECT USING P6 INTEGRATION API
  • 29347259 FP BUG-BUG 29061786 - USER ADMINISTRATION PAGE LOADS SLOW FOR NON-ADMIN SUPERUSER

TEAM MEMBER

  • 29356663 BUSINESS RULE VIOLATION ALERTS BLOCKED USING IIS WEB SERVER CUSTOM ERROR CONFIGURATION
  • 29246513 TEAM MEMBER MY ACTIVITIES PAGE NEVER STOPS
  • 26525952 CANNOT ENTER VALUES GREATER THAN 10,000 IN TEAM MEMBER
  • 26375799 FP: FIELD ENTRY LIMIT OF 10,000 FOR REMAINING UNITS IN TEAM MEMBER

INTG

  • 29551485 FP-BUG 29487453 - PROJECT ARBITER STUCK DUE TO DATABASE CONNECTIVITY ISSUE
  • 27342440 FP:BUG 26822424 - PERFORMANCE DEGRADATION ON READACTIVITIES OPERATION AFTER UPGR
  • 29290211 INCORRECT VALUE RETURNED FOR PLANNEDVALUECOST FIELD USING ACTIVITYSERVICE
  • 29518276 FP-SCHEDULED SERVICE USE SERVICE'S RUN TIME OPTION TO CHANGE DD DOES NOT IGNORE SECONDS

Oracle Primavera P6 18.8.7.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.7.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29429837 NOT POSSIBLE TO SEARCH ALL COLUMNS IN THE RISKS PAGE IN WEB
  • 29360341 INTERNAL FP : BUG 29214996 - XML IMPORT ADVANCED TAB - DOES NOT SHOW DATA FROM XML FILE
  • 29284260 P6 - EXPORT TO XML, ALLOW CHECKBOX TO SELECT ALL BASELINES AT ONCE
  • 29209787 UPDATE WBS FIELDS IN THE ACTIVITY VIEW
  • 29353121 PROJECT CODE VALUE PARAMETER IS NOT REFRESHING IN P6 REPORT
  • 29343038 UNABLE TO MODIFY PROJECT NAME WITHIN ACTIVITY TABLE IN EPS UNLESS DELETED
  • 29341770 FP-BUG 29124021 - THE CBS CODES SEARCH RESULTS SHOWS EMPTY WHEN CBS CODES ARE PRESENT .
  • 29336087 ACCESSING RESOURCES TAB IN P6 WEB NEVER FINISHES AND TRIGGERS PERFORMANCE ISSUES
  • 29334236 FP ERROR DISPLAYED WHEN RUNNING A REPORT ON P6
  • 29330154 RESOURCE ASSIGNMENTS PAGE DOES NOT LOAD
  • 29307665 PUBLICATION FLAG REENABLES AFTER COPY AND PASTE IN WEB APPLICATION
  • 29259805 UNABLE TO DELETE MORE THAN 574 RISK CATEGORIES AT ONE TIME
  • 29203330 NO ENTRY IN RSRCOVERALLOC TABLE,WITH A RESOURCE WITH A ROLE ASSIGNED AND OVER ALLOCATED,
  • 29060101 ASSIGN BUTTON MENU ITEMS MISSING WITH SHORT DETAIL PANE
  • 28872484 TECHNIPNET PROD/STAGE ENVIRONMENTS SLOW PERFORMANCE
  • 29367776 CANNOT SET THE WEB SERVICES IMPORT EXPORT TEMP DIRECTORY
  • 26984074 FILL DOWN FUNCTION DOESNT WORK AS EXPECTED USING SHIFT KEY

P6 CLIENT

  • 29330607 DELETED WBS REAPPEARS WHEN IT CONTAINS LOGICALLY DELETED DATA
  • 29312308 XML IMPORT => OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT.
  • 29290055 ALL USERS COULD NOT LOGIN AFTER IMPORTING XER FILE
  • 29268916 SPREAD IS NOT USING MANUAL CURVE WHEN UPDATING RD AND MOVING DD.
  • 28826579 MSP XML EXPORT ERROR THE GIVEN KEY WAS NOT PRESENT IN THE DICTIONARY
  • 29347320 NON-ENGLISH CHARACTERS NOT CORRECTLY HANDLED BY XML EXPORT/IMPORT FROM P6 CLIENT
  • 29139313 IMPORTING XER HANGS ON SAVING CHANGES IN CLOUD ENVIRONMENT USING CLIEN-SIDE CACHE
  • 29235621 SWITCHING PORTFOLIO SENDS INDIVIDUAL LOADING SUMMARY DATA REQUESTS PER PROJECT IN PORTFOLIO

TEAM MEMBER

  • 29284725 FP-BUG-29133508 - USER CAN MARK ACTIVITY AS COMPLETE IN TEAM MEMBER BUT CANNOT ENTER TIME AFTER CLICKING THE COMPLETE CHECK SYMBOL

INTG

  • 28667712 LARGE ARCHIVELOG CREATION INCREASE WHEN PUBLISHING RESOURCE AND ROLE DATA
  • 29360264 INTERNAL FP : BUG 29198529 - IMPORTPROJECTASYNCASAP DOES NOT RETURN ERROR MESSAGE IF AN IMPORT PROJECT FAILS

Oracle Primavera P6 18.8.6.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.6.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29330079 DOWNLOADED RESOURCE ASSIGNMENT SPREADSHEET NOT SHOW ALL TIME INETRVALS
  • 29040854 XML IMPORT STATES XML IS NOT A VALID FILE
  • 29336188 COULD NOT FIND STORED PROCEDURE 'PX_RSRCRLASGNMNT_DEL_ROLLED' WHEN JOB TYPE: PROJECT ARBITER (JT_PROJECTARBITER) ENABLED ON MSSQL DATABASE
  • 29319176 EXCEL EXPORT FROM ASSIGNMENTS VIEW (PROJECT AND RESOURCE VIEWS) RETURNS ERRORS
  • 29298699 ERROR: PLEASE ENTER A VALID NUMBER WHEN TRYING TO USE NEGATIVE INTEGER AS REPORT PARAMETER
  • 29285705 WAS THE EXPORT CLASSIC VIEWS IN RESOURCES>ASSIGNMENTS REMOVED INTENTIONALLY?
  • 29272444 FP BUG-BUG 28666114 - SHOW USAGE (FROM ACTIVITIES > ASSIGNMENTS WHEN ADDING/MODIFYING RESOURCE) ONLY SHOWS 1 YEAR SPREAD
  • 29238996 FP RESOURCES ALLOWED TO UPDATE TIME SHEETS AGAINST ACTIVITIES THEY ARE NOT ASSIGNED TOO
  • 29205394 XML IMPORT HAS A COMPLETELY DIFFERENT AND DUPLICATED UDF VALUES ASSIGNED TO EACH ACTIVITY
  • 29190722 ADD BUTTON DISABLED AFTER PASTING TEXT IN TIMESHEET NOTE
  • 29144207 THE DROPDOWN LIST OF THE ACTIVITIES,EPS,RES ASSIGN. VIEWS CAN NOT KEEP THE MOST RECENT VISITED VIEWS.
  • 29041037 WHEN ADJUSTING THE RISK THRESHOLD LEVELS FROM LOWEST TO HIGHEST, THE LOWER VALUES RESET WHEN A HIGHER VALUE IS ADJUSTED

P6 CLIENT

  • 29323814 EPS RELATED ACTIVITY CODES ARE NOT IMPORTED THROUGH XML AFTER UPGRADE TO 18.8.5.0
  • 29250010 RUSSIAN LANGUAGE TRANSLATION ERROR IN P6, PAGE SETUP, MARGINS
  • 28940899 UNITS&PRICES FOR RESOURCES NOT IMPORTED FROM MSP XML TO P6 PRO WITH SQLITE
  • 28716511 RECEIVING PROJECT WAS DELETED BY ANOTHER USER WHEN ATTEMPTING TO COPY/PASTE
  • 29330561 INCREASE SESSION-TIMEOUT IN P6PROCLOUDCONNECT.WAR TO 60 OR 120 MINUTES
  • 29243072 IMPORTING FROM MSP XML TO PRIMAVERA P6 18.8.X WITH WRONG LAG VALUES
  • 29229079 RESOURCE ASSIGNMENTS FILTER ERROR WITH PRICE/UNIT AND MATERIAL RESOURCE
  • 29192130 VISUALIZER WILL NOT DISPLAY VARIANCE - BL PROJECT DURATION
  • 29026217 EXPECTED FINISH OPTION DOES NOT SHOW/CAN'T BE CHANGED IN COLUMN
  • 28945422 IMPROVE PERFORMANCE FOR DELETING RESOURCES AND UDFS
  • 28935752 YOU ARE NOT AUTHORIZED TO USE THE APPLICATION USING TURKISH FORMAT
  • 28923299 UNABLE TO CONNECT TO THE DATABASE USING TURKISH FORMAT
  • 28866550 FP BUG-BUG 28497908 - THE IMPORT TO FIELD SHOWS BLANK OR INCORRECT WHEN CHECKING IN PROJECTS
  • 28865159 IMPORTING BIG XER TO PROFESSIONAL THROUGH PROCLOUDCONNECT WITH CLIENT CACHE ENABLED GETS STUCK
  • 28854663 P6 PRO CLIENT HANGS CREATING APPLY ACTUALS JOB
    28733113 LEVELING OPTION OF 'CONSIDER ASSIGNMENTS IN OTHER PROJECTS WITH PRIORITY EQUAL/HIGHER THAN' BOX IS TICKED ACTIVITY DATES MOVE WHEN SCHEDULED
  • 28683069 UNABLE TO OPEN THE XML FORMAT FILE EXPORTED FROM P6
  • 28941689 MULTIPLIED LAG AFTER IMPORTING XML FILE FROM MSP TO P6
  • 28896135 DATABASE CONFIGURATION FAILING TO WRITE HOST, PORT, SERVICE TO PRMBOOTSTRAPV2.XML VENUS TAGS

 Team Member

  • 29234150 USERNAME WITH Ãœ IN THE NAME CAUSES AUTHENTICATION FAILURE

INTG

  • 28932860 ESTIMATEDWEIGHT METHODS DO NOT EXIST AT THE WBS LEVEL
  • 29026170 ERROR: ONLY ONE DRIVING PROJECT IS PREMISSIBLE PER FILE. IMPORTING XML PROJECT USING P6 INTEGRATION API