Oracle Primavera P6 Patch 16.2.8 Released
The following issues were resolved for Primavera P6 16.2.8. For more information visit Oracle Support.
P6 WEB
- 
26256757 - Resource analysis/resource team shows no values when grouped by project code 
- 
26221730 - My preferences, view tab: an error occurred while processing your request 
- 
26181766 - Invalid parameters requested when running sample P6 reports 
- 
26150992 - Not able to select 0 as target with check schedule parameters in P6 web 
- 
26144337- Time periods page mostly blanks when unchecking use assigned calendar... 
- 
26143935 - Access denied when viewing log for service initiated by a different user 
- 
26130917 - Actual units/costs for analysis role always displayed in spreadsheet 
- 
26125852 - HTML assignments - save filter fails for resourceteam 
- 
26114003 - Analysis page not loading all resource information in P6 web 
- 
26093439 - Enterprise data html page udf indicators parameter value not in decimals 
- 
26049974 - EPPM16.2.4: unable to save users list from ldap using copy preferences option 
- 
26042949 - Resources / planning then assign resource using search 
- 
26026171 - MSP import fails with msg field plannedfinishdate may not be set to null 
- 
26020594 - Internal-fp: 25942230 - cost data is incorrect in xml import 
- 
26020508 - Project deleted from the database when removed from risk matrix 
- 
26008558 - EPS/project name replaced w/ ellipsis when text runs out of the picker box area 
- 
26003521 - Setting ask me to select each time I assign doesn't work in standard view 
- 
26000945 - Dynamic parameter p_P6_role_id uses role name instead of role id from P6 web 
- 
25997101 - Adding project to export project scheduled service, exception has occurred! 
- 
25995897 - Project list does not show correctly filtered projects when switching views 
- 
25963441 - Standard view - predecessor and successor dialog box shows no activities 
- 
25953585 - Link selected activities greyed out in standard view 
- 
25946618 - Global calendars time periods 'between 1 and 8784' is cut off 
- 
25942707 - Message 'generating report' does not disappear when running reports in P6 web 
- 
25940516 - Codes with commas in name error invalid parameters request when run from P6 
- 
25932329 - Copy from template in new EPS creates wrong project information 
- 
25922489 - Error when same user switch to team usage view for the second time 
- 
25918723 - P6 report displays incorrect labels for profile privileges 
- 
25914847 - Reports are getting downloaded without file extensions 
- 
25912491 - Approve timesheets not working problem populating upklist table 
- 
25912230 - The team usage page does not load successfully 
- 
25906901 - Unable to save change in activity % complete 
- 
25889004 - Activities page hangs when succ/predecessor details columns added to globalview 
- 
25888330 - Issues when entered a risk threshold-high value with commas like 9,999,999 
- 
25853644 - Unable to load data when attempting to switch to basic view in the activities p 
- 
25764865 - Unable to removed named resources from the resource planning page once saved 
- 
25742903 - EPS group band UDF date fields blank out when switching views 
- 
25722702 - Missing values in spreadsheet for resource analysis view 
- 
25830611 - Internal P6 EPPM Java download links are downloading wrong version 
INTG
- 
25812568 - API error array index out of bounds 16.2.3 API 
- 
25810651 - Primary resource not imported for milestone activities 
- 
25772273 - Set_refrdel_project_bypass not working with P6 web services 
- 
25944061 - FP: gateway - P6 adapter does not allow write on activitystep for project 
- 
25931606 - ORA-04091: table admuser.project is mutating, trigger/function may not see it 
- 
25880864 - Gateway - P6 adapter does not allow write on activitystep for project 
TM
- 
25826314 - Activity list in team member shows planned tasks 
- 
25819050 - Updating tasks with activity % in team member does not update within P6 
- 
26007050 - Status other resources not available until actual start is approved 
- 
25773087 - Team member functionality with 508 compliance - jaws reader 
- 
25945417 - Add error handling and remove password authenticator for for none email security 
- 
25994085 - Error: actual finish date must have a resume date when doing status review 
- 
25972786 - Chrome developer tool console shows 403 forbidden when accessing team member 
- 
26001839 - Timesheet status does not match when edit resource's timesheet 
SRVS
- 
26030031 - Apply actuals jobs completed with errors- unable to bring up the log file 
- 
26172895 - Apply actuals jobs completed with errors due to -ve & +ve rsrc business rule 
ADMIN
- 
25719267 - Users link in administrator page hangs/spins 
P6PRO
- 
26237756 - Gantt chart bar disappears when collapsing and expanding the table rows 
- 
26237736 - Optimize row height not including all text in the field using various fonts 
- 
26237513 - Enabled filters become disabled when clicking select column header 
- 
26237476 - UDF value cannot be imported from P6v7 to P6r15.1 
- 
26088156 - Resource usage profile limit line drawn incorrectly under certain steps 
- 
26076496 - P6 client - update baseline is not honoring the filter setting 
- 
26076432 - Layouts belonging to unopened projects shows up in open layout dialog 
- 
26043136 - Schedule comparison report is prefixing ⣠with ã‚, i.e. ã‚⣠
- 
26030117 - Schedule options not retained when copying/pasting a project via job services 
- 
26029352 - Resources added multiple times to activity not displayed after update baseline 
- 
25997711 - Baseline field not set to <current project> after copying a project with no BL 
- 
25992151 - FP: when copy/pasting a project, the order of the notebook topics gets reversed. 
- 
25989541 - FP: create reflection doesn't create a project 
- 
25980987 - The application and database version do not match message when lastusername null 
- 
25980928 - Unique constraint (admuser.pk_udfvalue) violated when importing MS project file 
- 
25922485 - Physical % complete entry is set to 0% after xml import into an EPPM database 
- 
25883241 - P6 client - primary resource not imported for milestone activities 
- 
25851959 - Clicking jobs in the job status window causes the text to disappear 
- 
25808692 - Login issue: application and database versions do not match error 
- 
25358614 - Costs report does not display summary or grand totals. 
- 
25024446 - "Field" column is garbled in global change report 
- 
24760339 - Layouts in japanese characters cannot be saved correctly 
- 
23295920 - The filter does not work with the korean words correctly 
- 
23086837 - Chinese condition value is garbled when saving filter 
- 
22569877 - P6 Pro layout name shows chinese words as garbled characters 