Oracle Primavera Patch 16.2.5 Released
For those running Oracle Primavera P6 EPPM 16.2 (on premise) there is a new patch available.
Please note, there are two different versions of Primavera P6 EPPM currently available depending on whether you are running Primavera P6 on premise or in the cloud. The latest Primavera cloud version is 17.
WEB
|
25398001 |
SEARCH FEATURE NOT WORKING - SET TIMESHEET APPROVAL MANAGER FOR A RESOURCE |
|
25495160 |
COPY/PASTED PROJECTS NOT APPEARING IN WEB/PRO FOR ALL USERS |
|
25501916 |
PROJECT PUBLISHINGPROJECT ARBITER JOBS GETTING HUNG INTERMITTENTLY |
|
25501926 |
WHEN CREATING A BASELINE THE DESCRIPTION DISAPPEARS. |
|
25516607 |
PRE-MIGRATION 16.1.5: GATEWAY TIMEOUT WHEN ADDING PROJECT |
|
22750847 |
TIMESTAMP PUBLISHED INCORRECTLY FOR SUMACTUALFINISHDATE IN P6WBS VIEW |
|
22978201 |
ADDITIONAL INDEXES FOR P6 EPPM SCHEMA |
|
24711898 |
P6 WEB OUT OF SEQUENCE PROGRESS BAR FILL AT THE END OF THE CURRENT BAR |
|
25177940 |
DELETED PROJECTS ARE NOT AUTOMATICALLY REMOVED FROM SCHEDULED JOBS |
|
25364270 |
P6 FAILS TO ADD GATEWAY INTEGRATION PARAMETERS WITH CUSTOMERRORRESPONSEEXCEPTION |
|
25364931 |
RESOURCE ANALYSIS PAGE IS VIEWED IN CLASSIC OR JAVA APPLET MODE. |
|
25366537 |
SQL PROJECT STATUS REPORT NOT RUNNING FROM P6 |
|
25369079 |
LIMIT LINE DOES NOT SHOW WHEN GROUPING BY SOME FIELD IN RESOURCE ANALYSIS PAGE |
|
25385871 |
FILTERING ON ACTIVITY ID WITH BRACKETS DOES NOT FUNCTION PROPERLY. |
|
25386025 |
END USER HAS ABILITY TO DELETE EPS AND DOES NOT HAVE THE PRIVILEGE. |
|
25410535 |
PROJECT NOTEBOOKS DIALOG BOX DOES NOT DISPLAY COMPLETELY |
|
25422844 |
DIFFERENT LANGUAGES APPEARING IN USER ACCESS |
|
25446967 |
GANTT CHART BAR WITH TYPE "PERCENT COMPLETE" DOES NOT SHOW AS CONFIGURED |
|
25454876 |
ERROR CREATING RISK THRESHOLDS: FAILED SAVING DATA! ERRORS LOCATED: COLOR |
|
25456183 |
CANNOT SHOW BASELINE BARS FOR PROJECT GANTT CHART PORTLET IN THE DASHBOARD |
|
25462552 |
RESTRICTED EPS SCENARIO THROWS EXCEPTION IN P6 |
|
25471016 |
ACTIVITY CODES - PROJECTS IS NOT LOADING |
|
25594613 |
ACTIVITY SHEETS SYNC FROM P6 TO UNIFIER IS NOT WORKING |
|
25478225 |
JUNK CHARACTERS IN DESCRIPTION WHEN THE DOC IS CREATED ON CLIENT & VIEWED ON WEB |
|
25483988 |
VIEW OF PROJECTS CHANGE WHEN SWITCHING FROM CLASSIC TO STANDARD VIEW |
|
25491241 |
RESOURCE ANALYSIS ADDS OVERALLOCATED UNITS ON TOP OF TOTAL ALLOCATED IN GRAPH |
TM
|
25494905 |
USER ACCESS IS NOT FILLED DOWN CORRECTLY |
|
25415736 |
PAST PERIOD TIMESHEETS NOT VISIBLE IN TIMESHEET APPROVAL |
|
25426231 |
TEAM MEMBER DOES NOT BRING ACTIVITIES ASSIGNED TO THE USER |
|
25471875 |
P6 TEAM MEMBER MY TASKS NOT POPULATING WITH OWNER ASSIGNED ACTIVITIES. |
|
25408735 |
HIERARCHY CODE VALUES MISSING IN TEAM MEMBER |
|
25515693 |
"YOU ARE NOT AUTHORIZED TO PERFORM ACTION" SAVING STEPS IN TM |
|
25501919 |
CANNOT ASSIGN RESOURCE TO TASK IN TEAM MEMBER TO SPECIFIC TASKS |
|
25501909 |
TEAM MEMBER ALLOWS NATIVE LOGIN USING /P6TMWEB/LOGIN.JSP WHEN SET FOR SSO |
|
22858343 |
LOGIN TO EPPM VIA CLOUD TAKING OVER 1 MIN TO LOAD |
API
|
25495158 |
COULD NOT UPDATE REMAINING-LABOR UNITS THROUGH API |
ADMIN
|
25501922 |
EST_WT COLUMN IS NULL WHEN IMPORTING FROM XLS |
|
25495157 |
MANGLER SCRIPT - STRING OR BINARY DATA WOULD BE TRUNCATED |
WS
|
25504179 |
UPDATE FAILED BECAUSE RELATED INSTANCE(S) HAS BEEN DELETED UPDATING OWNER |
|
25495156 |
THE INABILITY TO LIMIT CONCURRENT RUNS OF ASAP IMPORT/EXPORT JOBS |
|
25480642 |
COPY/PASTE WITH BASELINE RESULTS IN TX AND HW - ROW LOCK CONTENTIONS |
|
25501910 |
GSS LAST RUN TIME DOES NOT UPDATE WHEN RUN MANUAL CONFIGURED WITH P6SERVCES.JAR |
P6 PRO
|
25607865 |
ERROR WITH CODE "RAIIS-3224-4" OCCURS WHEN LEVELING RESUORCES |
|
25588709 |
PROJECT LAYOUTS DO NOT COPY WHEN THE PROJECT IS COPIED IN EPPM CLIENT |
|
25586588 |
SLOW PERFORMANCE: ADD TASK OR SETTING RELATIONSHIP BETWEEN TASK |
|
25551923 |
A USER CAN SEE HIS PROJECTS IN THE WEB, BUT NOT IN PRO CLIENT |
|
25522416 |
DELETE_SESSION_ID AS NULL IN USESSION TABLE |
|
25522415 |
"DO NOT IMPORT" EXTERNAL RELATIONSHIPS BEHAVIOR NOT CONSISTENT |
|
25522414 |
EVENT CODE EEQEM-3477-4 WHEN TRYING TO MOVE EPS NODES |
|
25522413 |
RESOURCE WITH LARGE DATA IN RESOURCE NOTES CANNOT BE EXPORTED VIA EXCEL FORMAT |
|
25522411 |
IN SQLITE DB SECURE CODES ARE NOT BEING RESTORED WHILE RESTORING A BASELINE |
|
25522410 |
UNABLE TO CUSTOMIZE LOG LOCATION FOR EXPORT/IMPORT |
|
25522407 |
PROJECT LAYOUTS FOR PROJECTS NOT OPENED ARE DISPLAYING IN THE OPEN LAYOUT WINDOW |
|
25501921 |
EXPORTING PROJECTS TO MS-PROJECT XML CREATES ILLEGAL CHARACTERS |
|
25501918 |
STAFF ROLE AND RESOURCE ASSIGNMENT IS BLOCKED (RESOURCE EXISTS, ROLE DOES NOT) |
|
25463163 |
ERROR DURING OPENING A PROJECT "TCVIRTUALDBENGINE.REFRESHROWSBYKEY..." |
|
25437195 |
UPDATE BASELINE ERROR: SEVERE FIELD "TEXT" IN UDFVALUE MAY NOT BE SET TO NULL |
|
25424696 |
LINK ACTIVITIES DISABLE WHEN ASSIGN PREDECESSOR/SUCCESSOR ARE ENABLED |
|
25394882 |
WHEN ASSIGN RECEPIENT TO P6 ISSUE, GET AVAA0 ERROR. |
|
25376843 |
ACTIVITY COLUMN "ROLES" SHOWS WITH LOOSE LOGIC IN P6 PRO |
|
25359705 |
USERDEFINEDFIELDVALUE UNIQUE CONSTRAINT ERROR WHEN UPDATING BASELINE |
|
25359614 |
RESOURCES ADDED MULTIPLE TIMES TO ACTIVITY NOT DISPLAYED AFTER UPDATE BASELINE |
|
25348200 |
VISUALIZER PERFORMANCE DUE TO LARGE AMOUNT OF EPS LEVEL ACTIVITY CODE VALUES |
|
25245072 |
ACTIVITY ID NOT EXPORTED TO MS XML USING SQLITE |
|
25042847 |
XER FILE IMPORT HANGS ON SAVING CHANGES |
|
24713685 |
AFTER PROJECT IS PASTED, MUST BE OPENED TO SEE NOTEBOOKS - EPPMDB |
|
25045334 |
UNABLE TO DELETE PROJECT CAUSE BY FILTER IN VISUALIZER PROJECT LEVEL LAYOUT |
|
25211505 |
XML IMPORT FAILS WHEN DATA WITH FINANCIAL PERIODS IS IN XML |
|
25214168 |
UNABLE TO DELETE PROJECT OR IMPORT PROJECT WHEN AUDING ENABLED ON TASKPRED |
|
25248544 |
P6 PPM CLIENT SUMMARY DATA DOES NOT INCLUDE NEGATIVE COSTS |