Oracle Primavera P6 19.12.4.0 Released

IMPORTANT UPDATE: The major patch 19.12.4.0 for P6 EPPM is now available. The following list of patches have been added for Primavera


WEB

  • 31136129 FP BUG 31113472 - ERROR: UNABLE TO SAVE CHANGES WHEN ENTERING A ZERO IN A UDF FIELD ON THE DASHBOARD
  • 31120927 PRE202:GROUPING RESOURCE BY RESOURCE CODES, ALL RECORDS ARE DISPLAYED UNDER NO RESOURCE CODE
  • 31073732 19-FP-'REJECT' OPTIONS BECOME UNAVAILABLE IN 'APPROVE TIMESHEETS' AFTER CANCELING OUT OF THE REJECT SEND EMAIL WINDOW
  • 31073611 FP - TIMESHEET APPROVAL IS NOT SHOWING UPDATED , THE NOTES ICON DOES NOT CHANGE TO NO NOTE DETAILS OF THE REJECTION
  • 31064622 CONFUSION WHY PRINT ICONS ARE DIFFERENT BETWEEN GRID VIEW OR BAR VIEW IN P6 WEB
  • 31041207 ERROR WHILE MIGRATING SETTINGS FROM ADMIN.JSP TO APPLICATION SETTINGS
  • 31040215 ACTIVITIES VIEW DOWNLOAD LINK CAUSES IE BROWSER TO HANG WHEN FILENAME CONTAINS MORE THAN 218 CHARACTERS
  • 31024556 CANNOT CUT/COPY PASTE AN ACTIVITY WHICH CONTAINS NEGATIVE FLOAT IN P6
  • 31022640 FP-THE UDF TEXT VALUE IS SHOWING (NULL) IN UDFVALUE TABLE
  • 30590043 [STAGE] - PRE MIGRATION 19.11 - SCHEDULED SERVICES - SUMMARIZATION SHOWS STATUS FAILED - NO ERRORS
  • 30358508 ACTIVITY ID'S ARE NOT GETTING IMPORTED AS EXPECTED FROM MSP TO P6
  • 31008122 INEFFICIENT JAVASCRIPT EXECUTION CAUSING PERFORMANCE DEGRADATION WITH RESOURCES > ASSIGNMENTS PAGE
  • 30995355 FP - COLUMN WIDTH CHANGES AFFECT ALL ASSIGNMENT PAGES
  • 31094700 FP - P6 WEB:CLICKING THE APPROVALS TAB IT HANGS CAUSING ORA-01795: MAX. NUM. OF EXPR. IN A LIST IS 1000
  • 30968955 FP BUG 30908921 - THE AT COMPLETION UNITS SHOW INCORRECTLY ON THE Y AXIS AREA CHART ON THE CAPACITY PLANNING VIEW
  • 30968332 FP BUG 30892541 - UPDATE USERS FROM LDAP SEARCH FUNCTION IS FAILING
  • 30925124 PUBLICATION JOBS FAILING WITH SEVERE: TIMESTAMP:[SERVICE]:[PXSERVICE]: NULL JAVA.LANG.ARRAYINDEXOUTOFBOUNDSEXCEPTION

TM

  • 31117038 19-FP-REJECTED TIMESHEET CONTINUES TO SHOW AS REJECTED AFTER THE USER OPENS THE TIMESHEET AGAIN
  • 31074234 19-FP-'ASSIGN TASKS' OPTION AVAILABLE IN ACTIONS MENU FOR ALREADY APPROVED TIMESHEET
  • 31073472 FP- TIME LEFT FIELD IS EDITABLE AFTER THE TIMESHEET HAS BEEN SUBMITTED
  • 31050315 WHEN SAVING COMPLETED ACTIVITY ERROR WHILE TRYING TO PERFORM UPDATE: ORG/APACHE/COMMONS/TEXT/STRINGESCAPEUTILS

SRVS

  • 31082765 PROVIDE P6WS-JAXWS-CLIENT.JAR & DEMO APPLICATION AVAILABLE AS A DOWNLOAD LINK FROM THE WELCOME OR SERVICES PAGE
  • 31055052 FP- ERROR WITH DELETE_DISSOLVE ACTIVITIES
  • 30348174 GATEWAY INVOKING P6 WEBSERVICES FAILS TO UPDATE THE P6 DESTINATION WITH ERROR CONN RECYCLED. DATABASE XXX POOL PMT
  • 31115846 FP - BUG 31089311 - ERROR WITH READACTIVITIES ON ACTIVITYSERVICE WEB SERVICE

P6PRO

  • 31039542 PRINT FUNCTIONS ARE INTERMITTENTLY GRAYED OUT IN P6 PRO ON WINDOWS 2016
  • 31039514 INCORRECT RUSSIAN TRANSLATION IN SCHEDULE OPTIONS CALCULATE FLOAT BASED ON FINISH DATE OF EACH PROJECT
  • 31039497 INCORRECT RUSSIAN TRANSLATION OF BUTTON TITLE IN LEVEL RESOURCES
  • 31038844 MSP XML EXPORT FROM PPM DB IS EXPORTING PLANNED FINISH TO THE FINISH DATE FIELD
  • 31084537 P6 PROFESSIONAL PVD FREEZES WHEN ACCESSING THE TRACKING VIEW MULTIPLE TIMES IN A SINGLE SESSION
  • 31084136 VISUALIZER IS TAKING A LONG TIME TO LOAD TSLD
  • 31039417 ROW HEIGHT IS NOT WORKING
  • 31039284 P6PRO ALLOWS IMPORTING MULTI-LINE UDF VALUES THROUGH XLS IMPORT
  • 31038967 EXPORT MSP XML ERROR INPUT STRING WAS NOT IN A CORRECT FORMAT.
  • 30884825 IMPORT MILESTONES WITH RESOURCE ASSIGNMENTS AS SETTING IN PRO CLIENT DOING THE OPPOSITE FROM SELECTED SETTING

Oracle Primavera P6 19.12.3.0 Released

IMPORTANT UPDATE: The major patch 19.12.3.0 for P6 EPPM is now available. The following list of patches have been added for Primavera


WEB

  • 31011621 IN MY PREFERENCE, VIEWS, RESOURCE ASSIGNMENTS VIEW PICKER IS NOT DISPLAYING FOR ALL LANGUAGES
  • 31002732 CANNOT ADJUST ACTIVITIES OR ASSIGNMENTS LAYOUT FROM MY PREFERENCES IF USING ANY LANGUAGE OTHER THAN ENGLISH
  • 30975647 FP - PROJSET TABLE IS NOT GETTING AUDITED
  • 30941173 PERFORMANCE SLOW WHEN SWITCHING BETWEEN ACTIVITY VIEWS
  • 30916197 CHECK MARKS FOR GLOBAL SCHEDULED SERVICES WILL NOT STAY CHECK MARKED
  • 30881363 INTERNAL-BP : INCORRECT UNITS ROLLUPS FOR MATERIAL RESOURCES ARE SHOWN ON THE RESOURCE ASSIGNMENTS VIEW
  • 30877063 AUTOVUE CONFIGURATION FILES AVESAPI.PROPERTIES AND VALIDATION.PROPERTIES FILES LOCATION
  • 30867803 POOR TIMESHEET APPROVAL PERFORMANCE WITH TIMESHEET AUDITING ENABLED
  • 30832749 PLANNED UNITS INCORRECT AFTER ASSIGNING RESOURCES WITH GLOBAL SEARCH AND REPLACE
  • 30821518 INVALID PARAMETERS REQUESTED WHEN SELECTING ALL AS A PARAMETER VALUE ON REPORT FROM P6
  • 31023002 ERROR AT THE END OF THE DATABASE UPGRADE PROCESS FROM R15 18.8.16.0 TO R19 19.12.2.0
  • 30715497 SQL DB - FP- USER LOGIN REPORT ONLY RETURNING 5 DAYS OF DATA
  • 30753177 FP BUG 30476890 - DBCONFIGPV AND ADMINPV FAIL WITH ERROR UNABLE TO RESOLVE PRIVILEGED USERNAME AND PASSWORD. HANDSHAKE_FAILURE FOR DATABASE CONNECTION THROUGH SSL
  • 30715364 RELATIONSHIP LAG ENTRIES NOT SAVED WHEN ACTIVITIES ARE COPIED TO ANOTHER PROJECT
  • 30704758 GETTING ERROR 'UNEXPECTED ERROR. UNABLE TO IMPORT VIEWS' WHEN IMPORTING EXPORTED JSON FILE

TM

  • N/A

SRVS

  • 30982015 LIMIT PROJECT LEVEL CALENDARS INTO CALENDARX TO PROJECTS/BASELINES WITH PUBLICATION ENABLED
  • 30952597 ERROR: LEASE REQUEST TIMEOUT WHILE WAITING 30 SECONDS FOR A CONNECTION TO BECOME AVAILABLE WHEN CREATING OR UPDATING RESOURCE ASSIGNMENTS USING P6 WEB SERVICES
  • 30882747 SCRIPT TO PARTITION THE TABLES IN P6 DATABASE

P6PRO

  • 30999239 INTERMITTENT WARNING DATABASE HAS NOT BEEN CONFIGURED TO RUN BACKGROUND JOBS - FP
  • 30921320 PROJECTISSUE APPEARS OUT OF ORDER ERROR WHILE IMPORTING P6 XML INTO P6 EPPM
  • 30894225 EXCEL FILE IS LOCKED FOR EDITING BY ANOTHER USER AFTER THE IMPORT IS COMPLETE
  • 30871841 EXPORTING TO MICROSOFT XML RESULTS IN A PARTIAL EXPORTED XML FILE THAT STOPS BEFORE COMPLETING
  • 30838238 MSP XML EXPORT ERROR THE GIVEN KEY WAS NOT PRESENT IN THE DICTIONARY.
  • 30921471 LDAP FAILOVER DOESN'T WORK IN P6 PRO

Oracle Primavera P6 18.8.18.0 Released

IMPORTANT UPDATE: The major patch 18.8.18.0 for P6 EPPM is now available. The following list of patches have been added for Primavera


WEB

  • 30950358 PROJSET TABLE IS NOT GETTING AUDITED
  • 30908921 THE AT COMPLETION UNITS SHOW INCORRECTLY ON THE Y AXIS FOR THE AREA CHART ON THE CAPACITY PLANNING VIEW
  • 30892541 UPDATE USERS FROM LDAP SEARCH FUNCTION IS FAILING
  • 30867795 POOR TIMESHEET APPROVAL PERFORMANCE WITH TIMESHEET AUDITING ENABLED
  • 30819622 COPYING/PASTYING RISKS NOT POSSIBLE WHEN THE PROJECT HAS A RISK SCORING MATRIX ASSOCIATED
  • 30795373 COLUMN WIDTH CHANGES AFFECT ALL ASSIGNMENT PAGES
  • 30912746 BP OF BUG 29943830 - LARGE AMOUNT PROJECT DATA WHERE EACH PROJECT USES A UNIQUE DEFAULT CALENDAR CAUSES PROJECT PAGE LOADING DELAY AND HIGH MEMORY CONSUMPTION
  • 30867543 BP BUG-P6 WEB PROJECT EPS VIEW 'COULD NOT LOAD SERVICE DETAILS. PLEASE CONTACT YOUR SYSTEM ADMINISTRATOR'
  • 30797989 FP BUG-PROJECT SCHEDULED SERVICES - SCHEDULE JOB LOGS
  • 30774488 TYPING SEARCH IN MANAGE PORTFOLIO FILTER DOESN'T RETURN THE CORRECT RESULT
  • 30715491 SQL DB - FP- USER LOGIN REPORT ONLY RETURNING 5 DAYS OF DATA
  • 30715365 RELATIONSHIP LAG ENTRIES NOT SAVED WHEN ACTIVITIES ARE COPIED TO ANOTHER PROJECT
  • 30655236 FP - ASSIGNMENTS PAGE DOES NOT LOAD IN P6 WEB
  • 30644640 FP BUG-ERROR: USER DOES NOT HAVE EDIT COST/FINANCIALS PRIVILEGES ON OBJECT PROJECT

TM

  • N/A

SRVS

  • 30749101 LARGE INCREASE IN RSRCROLEASGNMENTSPREAD TABLE SIZE
  • 30982851 PROJECT PUBLICATION FAILING CAUSED BY: JAVA.LANG.ILLEGALARGUMENTEXCEPTION: OVERFLOW
  • 30792448 REMAINING FINISH DATES INCORRECT WHEN SCHEDULING WITH PROJECT SCHEDULE SERVICE

P6PRO

    • 30937750 SYSTEM.NULLREFERENCEEXCEPTION: OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT WHEN IMPORTING XML TO SQLITE DB
    • 30903213 MSP XML EXPORT FROM PPM DB IS EXPORTING PLANNED FINISH TO THE FINISH DATE FIELD
    • 30885508 UPDATE BASELINE OPTION 'RUN OPTIMIZED' IS MISSING AS AN OPTION IN UPDATE BASELINE DIALOG
    • 30768340 P6PRO ALLOWS IMPORTING MULTI-LINE UDF VALUES THROUGH XLS IMPORT
    • 30596245 ROW HEIGHT IS NOT WORKING30545738 UPDATE BASELINE FAILS WITH ORA-01400
    • 30502686 INCORRECT RUSSIAN TRANSLATION OF BUTTON TITLE IN LEVEL RESOURCES
    • 30480125 PRINT FUNCTIONS ARE INTERMITTENTLY GRAYED OUT IN P6 PRO ON WINDOWS 2016
    • 30921456 LDAP FAILOVER DOESN'T WORK IN P6 PRO
    • 30986734 ABLE TO LOGIN P6PROFESIONAL USING NATIVE USERNAME/PASSWORD WHEN LDAP IS ENABLED
    • 30921314 PROJECTISSUE APPEARS OUT OF ORDER ERROR WHILE IMPORTING P6 XML INTO P6 EPPM
    • 30864845 EXPORT MSP XML ERROR "INPUT STRING WAS NOT IN A CORRECT FORMAT."

Oracle Primavera P6 19.12.2.0 Released

IMPORTANT UPDATE: The major patch 19.12.2.0 for P6 EPPM is now available. The following list of patches have been added for Primavera


WEB

  • 30861453 P6 DATABASE UPGRADE FAILS UPGRADING TO 19.10
  • 30836916 COPYING/PASTYING RISKS NOT POSSIBLE WHEN THE PROJECT HAS A RISK SCORING MATRIX ASSOCIATED
  • 30823520 INTERNAL-BP:IMPORT ON SCHEDULE/LEVEL FAILS FOR A PARTICULAR SCENARIO
  • 30809665 ERROR: MULTIPLEFLOATPATHSENDINGACTIVITYOBJECTID: FIELD CANNOT BE SET WHEN CALCULATE MULTIPLE FLOAT PATHS IS DISABLED WHEN IMPORTING XML
  • 30798033 FP BUG-PROJECT SCHEDULED SERVICES - SCHEDULE JOB LOGS
  • 30787379 FAILED TO LOAD AVESAPI.PROPERTIES AS A CLASSLOADER RESOURCE WHEN UPGRADING FROM 19.12 TO 19.12.1
  • 30755474 INCORRECT UNITS ROLLUPS FOR NON LABOR RESOURCES ARE SHOWN ON THE RESOURCE ASSIGNMENTS VIEW
  • 30748738 P6 WEB PROJECT EPS VIEW COULD NOT LOAD SERVICE DETAILS. PLEASE CONTACT YOUR SYSTEM ADMINISTRATOR
  • 30739735 P6 WEB ACTIVITIES VIEW SWITCHING TO RESET VIEW CAUSES PRINT ICON TO SWITCH TO PRINTPDF ICON
  • 30738376 MS EDGE BROWSER NOT DISPLAYING UP AND DOWN ORDER ARROWS IN CUSTOMIZE VIEW WHEN FULL SCREEN
  • 30732618 ERROR 'PAGE UNRESPONSIVE' WHEN ACCESSING ACTIVITIES VIEW IN P6 WEB
  • 30729711 ATTEMPT TO UPGRADE ORACLE 12.2.0.1.0 STANDARD EDITION TO P6 EPPM R19.12 FAILS WITH IN-MEMORY COLUMN STORE ERROR
  • 30731105 FILE NOT FOUND IN THE SERVER. PLEASE CONTACT YOUR ADMINISTRATOR. CLICKING DOWNLOAD FILE LINK FROM SERVICE STATUS PAGE OVER SSL & HTTP/2 PROTOCOL
  • 30725803 MESSAGE DOES NOT SHOW EVEN THOUGH THE NUMBER OF EPS/PROJECTS HAS REACHED CONFIGURED LIMIT
  • 30688108 FINANCIAL PERIOD TIMESCALE ON GANTT - PENDING ITEMS
  • 30668418 LOADING THE REPORTS TAB AFTER EXCEEDING CACHE TIMEOUT TRIGGERS CACHING FOR THE ENTIRE REPORT STRUCTURE INSTEAD OF A LAZY LOAD CAUSING PERFORMANCE DEGRADATION WHILE LOADING THE PAGE
  • 30655238 FP - ASSIGNMENTS PAGE DOES NOT LOAD IN P6 WEB
  • 30644657 FP BUG-ERROR: USER DOES NOT HAVE EDIT COST/FINANCIALS PRIVILEGES ON OBJECT PROJECT

TM

  • 30704696 TMWEB PAGE DOES NOT LOAD IN CUSTOMER'S PRE-MIGRATION OCI ENVIRONMENT

SRVS

  • 30782125 FP- UNIFIER TO P6 GATEWAY SYNCHRONIZATION IN NEVER RUN STATUS
  • 30846843 STEPS 6-9 OF 'PUBLISH RESOURCE/ROLE DATA' (WHICH HANDLES ROLLUP DATA) CAN INSERT DUPLICATE DATA
  • 30792462 REMAINING FINISH DATES INCORRECT WHEN SCHEDULING WITH PROJECT SCHEDULE SERVICE
  • 30669845 'PUBLISH ENTERPRISE DATA' WILL DELETE/INSERT CALENDAR DATA WHICH HAS NOT BEEN UPDATED FROM LAST EXECUTION OF THE GLOBAL SCHEDULED SERVICE
  • 30436105 SUMMARIZECBS (JT_PROJECTCBS TRIGGERED BY WEB SERVICES) CAN STORE REMAINING SPREAD DATA IN RESOURCEASSIGNMENTCBSSPREAD WHICH DOES NOT

P6PRO

  • 30855819 ERROR: EXCEPTION ELISTERROR IN MODULE PM.EXE WHEN ATTEMPTING TO LOG IN
  • 30770491 XLS FILE EXPORT TEMPLATES ARE NOT UPDATED WHEN DELETING UDF FIELDS
  • 30755454 SYSTEM.NULLREFERENCEEXCEPTION: OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT WHEN IMPORTING XML TO SQLITE DB
  • 30717648 P6 PROFESSIONAL LOGIN CAN RESULT IN ERROR ORA-00054 EXECUTING GET_SAFETY_DATE
  • 30770502 REGULAR PROCESSES OF EXPORTING TO EXCEL AND SAVING REPORTS INTO CSV OR HTML FORMATS TAKE SIGNIFICANTLY LONGER SINCE UPGRADING P6 FROM 15.2.18 TO 18.8.
  • 30770473 THE LOCATION WHERE THE EXPORTED FILE IN MS PROJECT FORMAT IS SAVED IS NOT VISIBLE
  • 30770485 CLIENT-SIDE PERFORAMANCE DEGRADATION WHEN FOCUS SHIFTS OFF CURRENT FORM WHEN ACTIVITY LAYOUT CONTAINS LARGE COLLAPSEDELTA LIST

Oracle Primavera P6 19.12.1.0 Released

IMPORTANT UPDATE: The major patch 19.12.1.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

P6 CLIENT

  • 30677830 P6 PROFESSIONAL SQLITE LOGIN PROCESS HANGS AT 11% RESULTING IN POOR LOGIN PERFORMANCE
  • 30675609 ASCENDING OPTION IS AUTO SELECTED BY DEFAULT WHEN USER IS TRYING TO EDIT THE HIERARCHICAL ORDER OPTION IN LEVEL RESOURCES DIALOG
  • 30172859 SAVE FILE WINDOW CAN LOAD BEHIND JOB STATUS WINDOW
  • 30105652 SLOW PERFORMANCE OF CHECKING IN PROJECT FROM SQLITE TO CLOUD THROUGH PROCLOUDCONNECT
  • 30708074 BP-REPLACE REFLECTION PROJECT ERROR...EXPECTS PARAMETER '@PSERVICE_ID', WHICH WAS NOT SUPPLIED
  • 30675891 EXTERNAL TOOL OPTION DOES NOT RESPECT ENABLEIFNOPROJECTS
  • 30666713 P6 EPPM XML IMPORT UPDATE EXISTING ERROR - MATERIAL RESOURCES CANNOT HAVE TIMESHEETS
  • 30627150 FOOTERS ARE CORRUPTED AFTER UPGRADE
  • 30623433 EXPORT TO EXCEL NOT CAPTURING ALL FIELDS IN TEMPLATE
  • 30600668 PRO CLIENT CUSTOMIZED HEADER FIELDS SHOWING A PLUS SIGN '+' INSTEAD OF THE SPACE THAT WAS USED BEFORE UPGRADE
  • 30571909 THE SINGIN WEB SCREEN IS NOT FULLY DISPLAYED FOR LOGGING IN PROFESSIONAL CONFIGURED WITH SAML AUTHENTICATION
  • 30364822 VISUALIZER LAYOUT DISPLAYS NO GROUP BAND, NOT OBEYING FILTER
  • 30675441 P6 CRASHES WHEN CLICK BROWSE BUTTON IN 'APPLICATION USER LOGIN NAME'
  • 30675837 UNABLE TO IMPORT RESOURCE INTO P6
  • 30204716 WBS DELETION TAKES LONG TIME

WEB

  • 30689603 FULL USERNAME NOT DISPLAYED IN P6 WEB
  • 30701007 FP- USER LOGIN REPORT ONLY RETURNING 5 DAYS OF DATA
  • 30673059 THE SCHEDULED REPORT IS STUCK IN PENDING STATUS
  • 30665649 FP BUG 30505655 - TIMESHEET APPROVALS IS MISSING THE DAILY REPORTED HOURS
  • 30663090 ERROR: THE APPLIED VIEW <NAME> CANNOT BE LOADED. SELECT A DIFFERENT DEFAULT VIEW FOR THIS PAGE IN MY PREFERENCES
  • 30639904 FP- PORTFOLIO FILTERS MISSING BUILT-IN P6 FILTER CRITERIA AFTER UPGRADE TO V18.8
  • 30620422 IMPORT TEMPLATE - IMPORTRESOURCEUNDER IS NOT POPULATED WITH THE MODIFIED RESOURCE-NAME
  • 30662441 JAVA.LANG.NUMBERFORMATEXCEPTION: EMPTY STRING IMPORTING PROJECT XML.
  • 30615482 FP-EMAIL IS PROMPTED WHEN USER TRIES TO DOUBLE CLICK ON ASSIGNED RESOURCE FIELD AND FOCUS OUT IN ACTIVITIES PAGE
  • 30405262 FP BUG-BUG 30376008 - P6 WEB FREEZES WHEN SELECTING TIME APPROVAL
  • e30600140 USER INACTIVITY REPORT INCORRECTLY DISPLAYS USERS WHO HAVE CONNECTED WITHIN THE TIME PERIOD SPECIFIC FROM THE REPORT'S INPUT PARAMETER

TEAM MEMBER

  • 30695097 ERROR YOU ARE NOT AUTHORIZED TO PERFORM ACTION LOADING REST CALL /P6TMWEB/REST/TEAMMEMBER/TASK/ASSIGNMENTS/###
  • 30632816 FP- ACTIVITY START AND END DATES SHOWN AS TODAY'S DATE.
  • 30628253 GENERATE REPORT' IN TEAM MEMBER USING THE GOOGLE CHROME BROWSER DOESN'T ALLOW SAVING AS .HTML

SRVS

  • 30645003 FP BUG 30352258 - PREFIX 'UTF-8' IS INSERTED TO THE NOTEBOOK TOPIC DESCRIPTION USING WS

N/A

  • 29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
  • 29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
  • 29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
  • 29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
  • 29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
  • 30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
  • 29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
  • 29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
  • 29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
  • 29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
  • 29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
  • 29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
  • 29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
  • 29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
  • 29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
  • 29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
  • 29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
  • 29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
  • 29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
  • 29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.17.0 Released

IMPORTANT UPDATE: The major patch 18.8.17.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

P6 CLIENT

  • 30675530 ASCENDING OPTION IS AUTO SELECTED BY DEFAULT WHEN USER IS TRYING TO EDIT THE HIERARCHICAL ORDER OPTION IN LEVEL RESOURCES DIALOG
  • 30300793 XLS FILE EXPORT TEMPLATES ARE NOT UPDATED WHEN DELETING UDF FIELDS
  • 30707278 PRO CLIENT CUSTOMIZED HEADER FIELDS SHOWING A PLUS SIGN '+' INSTEAD OF THE SPACE THAT WAS USED BEFORE UPGRADE
  • 30700884 FOOTERS ARE CORRUPTED AFTER UPGRADE
  • 30693471 THE LOCATION WHERE THE EXPORTED FILE IN MS PROJECT FORMAT IS SAVED IS NOT VISIBLE
  • 30675492 PASTED GLOBAL CODE INTO EPS CODE GOES MISSING
  • 30212127 REGULAR PROCESSES OF EXPORTING TO EXCEL AND SAVING REPORTS INTO CSV OR HTML FORMATS TAKE SIGNIFICANTLY LONGER SINCE UPGRADING P6 FROM 15.2.18 TO 18.8.
  • 30023492 DUTCH TRANSLATION ISSUES WITH P6 PRO
  • 30563117 CLIENT-SIDE PERFORAMANCE DEGRADATION WHEN FOCUS SHIFTS OFF CURRENT FORM WHEN ACTIVITY LAYOUT CONTAINS LARGE COLLAPSEDELTA LIST

WEB

  • 30614394 MESSAGE DOES NOT SHOW EVEN THOUGH THE NUMBER OF EPS/PROJECTS HAS REACHED CONFIGURED LIMIT
  • 30548085 USER LOGIN REPORT ONLY RETURNING 5 DAYS OF DATA
  • 30539328 ERROR 'PAGE UNRESPONSIVE' WHEN ACCESSING ACTIVITIES VIEW IN P6 WEB
  • 30678957 NEED ADDITIONAL POPULATE_UACCESS FIX TO HANDLE MULTIPLE ROWS RETURNED ON SQLSERVER
  • 30467386 FILE NOT FOUND IN THE SERVER. PLEASE CONTACT YOUR ADMINISTRATOR. CLICKING DOWNLOAD FILE LINK FROM SERVICE STATUS PAGE OVER SSL & HTTP/2 PROTOCOL

TEAM MEMBER

  • NA

SRVS

  • NA

ADMIN

  • NA

OTHER

  • 29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
  • 29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
  • 29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
  • 29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
  • 29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
  • 30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
  • 29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
  • 29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
  • 29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
  • 29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
  • 29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
  • 29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
  • 29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
  • 29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
  • 29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
  • 29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
  • 29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
  • 29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
  • 29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
  • 29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.16.0 Released

IMPORTANT UPDATE: The major patch 18.8.16.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

WEB

  • 30620415 IMPORT TEMPLATE - IMPORTRESOURCEUNDER IS NOT POPULATED WITH THE MODIFIED RESOURCE-NAME
  • 30615468 FP-EMAIL IS PROMPTED WHEN USER TRIES TO DOUBLE CLICK ON ASSIGNED RESOURCE FIELD AND FOCUS OUT IN ACTIVITIES PAGE
  • 30578644 P6 MY PREFERENCES EMAIL NOTIFICATION TO RESOURCES NOT WORKING WHEN UNSTAFFED ROLE IS ASSIGNED A RESOURCE
  • 30559094 PORTFOLIO FILTERS MISSING BUILT-IN P6 FILTER CRITERIA AFTER UPGRADE TO V18.8
  • 30555839 IN EPS PAGE, CREATE A FILTER CONDITION AND APPLY, 400 BAD REQUEST IS DISPLAYING IN BELOW SCENARIO
  • 30530293 FILL DOWN PENDING ISSUES
  • 30484011 COLUMN WIDTHS NOT SAVED IN RESOURCES | ASSIGNMENTS PAGE
  • 30472119 ACTIVITY CHILD CODE VALUE IS NOT GETTING DISPLAYED AFTER PAGE REFRESH IN ENTERPRISE DATA
  • 30405244 FP BUG-BUG 30376008 - P6 WEB FREEZES WHEN SELECTING TIME APPROVAL
  • 30297516 RESUBMITTED HOURS NOT UPDATING IN TIMESHEET APPROVAL
  • 30239673 'KEY NOT FOUND' IN ADD PROJECT DIALOG WHEN SELECTED EPS NAME CONTAINS / AND ()
  • 30221673 LOG FILE FOR CREATE BASELINE IS BLANK

P6 CLIENT

  • 30502686 INCORRECT RUSSIAN TRANSLATION OF BUTTON TITLE IN LEVEL RESOURCES
  • 30365709 P6 PROFESSIONAL SQLITE LOGIN PROCESS HANGS AT 11% RESULTING IN POOR LOGIN PERFORMANCE
  • 30562607 REPLACE REFLECTION PROJECT ERROR...EXPECTS PARAMETER '@PSERVICE_ID', WHICH WAS NOT SUPPLIED.
  • 30511518 P6 EPPM XML IMPORT UPDATE EXISTING ERROR - MATERIAL RESOURCES CANNOT HAVE TIMESHEETS
  • 30375685 EXTERNAL TOOL OPTION DOES NOT RESPECT ENABLEIFNOPROJECTS
  • 30073813 UNASSIGNED RESOURCES APPEAR IN LEVELING LOG IN COPIED PROJECT
  • 30459795 UNABLE TO IMPORT RESOURCE INTO P6

TEAM MEMBER

  • 30493377 ACTIVITY START AND END DATES SHOWN AS TODAY'S DATE.

SRVS

  • 30352258 PREFIX 'UTF-8' IS INSERTED TO THE NOTEBOOK TOPIC DESCRIPTION USING WS

ADMIN

  • NA

 

29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

What's New in Oracle Primavera P6 EPPM Version 19

Oracle Primavera P6 EPPM Version 19 is out with some exciting new features.

  • Allow multiple users to access a Portfolio
  • Improvements to the Project Statistics Portlet: You can group and sort the data and view all levels of the WBS in the Project Statistics Portlet. You can also search, print and download the data in the portlet. When you click a project to drill down, you can customize the view of the data, including adding columns to both the activity grid and the assignments tab
  • Control maximum settings on the application settings page
  • Reject status updates made by team members if the data is incorrect
  • Send emails in Team Member Web without an installed email client
  • P6 for iOS Crash Reports: Information has been added to the P6 for iOS Help to explain how to find a crash report
  • Allow or restrict access to Resources from multiple Parent Resources
  • Improved granularity of data types when publishing Enterprise Data: You can select or exclude the following data types when publishing enterprise data: project, activity, resource, calendar, and enterprise data dictionary
  • Prevent timesheets users from entering hours outside assignment dates
  • View Migration Utility allows you to convert classic views to standard views
  • Scheduling and Leveling options can be exported to and imported from Primavera XML
  • Improved currency import
  • Update baselines when importing Primavera XML files
  • Clearer insight into role availability
  • Sort My Activities in Team Member by WBS Hierarchy
  • Store images: You can store images to ensure that your users always have access to the correct, most up-to-date images and logos
  • Improved visibility of assignments with units over plan
  • Select to see resource and role spread from all projects of a specific project
  • Add stored images to the header and footer when printing
  • Notify managers when a timesheet is rejected
  • Delete discussion items
  • Determine how marking complete in Team Member Web affects actual units
  • Dissolve activities with or without lag
  • Team Members can view secure codes
  • Control the export of project data
  • Printing enhancements: You can print directly to your default printer
  • Greater flexibility in Activity Page filters
  • Always know hen there are timesheets awaiting your action
  • Enable publication when copying projects
  • Select the start and finish dates for the resource and role usage charts
  • Import your non-work days from other applications
  • View Total Float to achieve more effective prioritization of your Activities
  • WBS Fields available in the Activities Page
  • Filter Activities to the hour
  • Control who can delete published project data
  • Import/Export Global Data: Import and export data in MS Excel format on the Enterprise Data page. In this release, import/export of resource curves, risk categories, units of measure, issue codes, document categories, overhead codes, and baseline types has been implemented.
  • Global and project options for importing Microsoft Project XML files
  • Remove the Expected Finish Date from a task in Team Member Web
  • View and edit user-defined fields assigned to steps in P6 Team Member
  • Default from email address (Cloud only)
  • Switch off warning about report accessibility
  • Import/Export Global: Import and export data in MS Excel format on the Enterprise Data page. In this release, import/export of funding sources, WBS categories, and step templates has been implemented.
  • Assign document user-defined fields
  • New home for notifications
  • Generate reports while you work
  • Determine how long to store audit data
  • Document uploads are scanned for viruses
  • Export resource and role Spreads to Excel

Oracle Primavera P6 18.8.15.0 Released

IMPORTANT UPDATE: The major patch 18.8.15.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

WEB

  • 30490847 ACTIVITY CODES DO NOT WORK WITH FILL DOWN
  • 30424312 FILL DOWN NOT SHOWING VALUES UNTIL AFTER CLICKING SAVE
  • 30420785 FILTER VALUE BEING USED IN FILTER IS SHOWING AS BLANK OR NULL IN COLUMN
  • 30409487 P6 XML IMPORT FAILS WITH ERROR 'ONE OF THE ASSOCIATED OBJECTS HAS BEEN DELETED'
  • 30407953 WBS HIERARCHY NOT SORTED HIERARCHICAL WHEN ADDING (+ ADD) PREDECESSORS OR SUCCESSORS (APPEARS BASED ON AN INTERNAL ID)
  • 30385719 SUMMARIZE ERROR: JOB TRIES TO USE FINANCIAL PERIODS WHILE THIS IS NOT CONFIGURED
  • 30362232 ERROR SEVERE: FIELD OBJECTID IN ACTIVITY MAY NOT BE SET TO NULL. WHEN IMPORTING XML
  • 30359290 UNABLE TO CHANGE RESOURCE ACCESS FOR SELF
  • 30294623 FILTER CRITERIA NOT DISPLAYING PROJECTS WHEN THE NUMBER OF EPS/PROJECTS EXCEEDS MAX SETTING
  • 30218045 USER INTERFACE VIEWS PAGE HANGS AFTER EDITING ACTIVITY EDITING VALUE AND SAVING
  • 30187764 GARBLED CHARACTERS OCCUR IN THE DESCRIPTION OF THE ISSUE TAB OF P6WEB

P6 CLIENT

  • 30399430 AUTO SCHEDULE DOES NOT WORK WHEN USING EXPECTED FINISH DATE
  • 30390540 CALENDAR REPACEMENT PERMITS PROJECT CALENDAR FROM ANOTHER PROJECT
  • 29329085 TRANSLATION ERROR IN RUSSIAN
  • 30493918 ERROR MISMATCHED UDF DATA TYPE. COLUMNTYPE: 3 EXPECTEDTYPE: 0 WHEN IMPORTING MSP XML FILE
  • 30410857 GLOBAL SEARCH & REPLACE DOESN'T WORK FOR SUBJECT AREA: RESOURCE ASSIGNMENT
  • 30289690 VISUALIZER LAYOUT DISPLAYS NO GROUP BAND, NOT OBEYING FILTER
  • 30023504 DUTCH TRANSLATION LAYOUT ISSUES WITH P6 PRO
  • 30401858 VISUALIZER LICENSE TYPE MISSING FROM P6 PPM V18 API
  • 30400085 WORDS ARE NOT VISIABLE / PARTIALLY VISIABLE IN THE UPDATE BASELINE DIALOG BOX
  • 29884125 TCVIRTUALTABLE.FIELDINDEXOF: COULD NOT FIND FIELD CONTROL_UPDATES_FLAG IN VTABLE PROJECT
  • 30537272 UNABLE TO RESHUFFLE THE PROJECT ON WBS WINDOW

TEAM MEMBER

  • 30171373 TM WEB: FUNCTIONAL ANOMALY IN MY ACTIVITIES PAGE FOR RESOURCES UPDATING

SRVS

  • 30358601 LARGE BUILDUP OF TEMP FILES IN IMPORT FOLDER DURING IMPORTPROJECTASYNCASAP WEB SERVICE

ADMIN

  • 0371953 LDAP TEST CONNECTION IS NOT SUCCESSFUL WHEN SSL IS CHECKED

 

29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.14.0 Released

IMPORTANT UPDATE: The major patch 18.8.14.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

WEB

  • 30282233 FP - BUG 30026025 [PROD] CANNOT OPEN ACTIVITY CODES - GLOBAL IN ADMINISTRATION TAB USING INTERNET EXPLORER
  • 30382640 ACTUAL FINISH DISPLAYED WHEN ADDING EXPECTED FINISH DATE
  • 30326729 FP ERRORS IN WEB ACCESS LOG WHEN PRINTING/MODIFYING GLOBAL CALENDAR
  • 30325222 REG:ERROR WHILE ADDING WBS TEMPLATES FROM ACTIVITIES PAGE
  • 30320331 TEMPLATE RECORDS ARE NOT SORTED IN A PROPER ORDER WHEN ADDING WBS FROM TEMPLATE FOR PROJECTS
  • 30299926 EPS IS UNDER FILTER NOT WORKING FOR PORTFOLIOS
  • 30230829 BAR COLOR SHOWS INCORRECTLY WHEN SAVING TO PDF IN P6 WEB
  • 30202219 ACTIVITY ID'S ARE NOT GETTING IMPORTED AS EXPECTED FROM MSP TO P6
  • 30375588 UNABLE TO RUN CUSTOM REPORTS OUT OF P6.
  • 30310458 PROJECT NAME OPTIONS INSTEAD OF PROJECT ID ONES ARE LOADED WHEN CREATING A FILTER AGAINST THE PROJECT ID
  • 30283461 CAPACITY PLANNING DISPLAYS ROLE DEMAND FOR PROJECTS USER DOES NOT HAVE ACCESS TO

P6 CLIENT

  • 30305466 VISUALIZER DOES NOT DISPLAY ALL NEEDED ACTIVITY CODE VALUES TO SELECT COLOR BY CODE
  • 30300793 XLS FILE EXPORT TEMPLATES ARE NOT UPDATED WHEN DELETING UDF FIELDS
  • 30178432 ADMIN SUPERUSERS ARE UNABLE TO CLOSE SESSIONS ON BEHALF OF ANOTHER USER.
  • 28940816 LOCK PRIMAVERA DATABASE ALIASES FOR P6 18.8 AND LATER
  • 29928881 WITH REVOKED PRIVILEGE 'ADD/EDIT/DELETE EPS EXCEPT COST/FINANCIALS' P6 PRO CLIENT NON-ADMIN USER IS ABLE TO MOVE EPS NODES AND EDIT EPS RM
  • 30095313 PRIMAVERA V18.8 - PERFORMANCE ISSUES INSIDE THE P6 CLIENT AFTER DATA WAS LOADED TO RAM
  • 30320680 RESOURCEMAX UNITS/TIME IN THE UPPER PANE DOES NOT REFLECT THE LATEST DETAIL ROW
  • 30073813 UNASSIGNED RESOURCES APPEAR IN LEVELING LOG IN COPIED PROJECT
  • 30176930 DEPLOY/PUBLISH CLICKONCE FAILS WITH MAGE.EXE ERROR CODE 1

TEAM MEMBER

  • 30309260 TEAMMEMBER DOESN'T GENERATE FULL EMAIL DETAILS WHEN HASH SYMBOL IN ACTIVITY NAME AND USING IE/EDGE

SRVS

  • NA

Oracle Primavera P6 Professional 18814

29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.13.0 Released

IMPORTANT UPDATE: The major patch 18.8.13.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 30281735 DATABASE LOCKS AND WAITS ON DELETE FROM RSRCROLEASGNMENTSPREAD
  • 30212879 CATEGORY COLUMN IN PROJECT->RISK IS NOT GETTING RETAINED AFTER REFRESH
  • 30209361 PROGRESS CANNOT BE VIEWED IN GANTT CHART IN EPS WINDOW.
  • 30201547 P6 WEB RISK DETAILS NUMBERED AND BULLETED LISTS DISPLAYS DIFFERENTLY IN EDITOR AND MAIN SCREEN
  • 30184228 RESPONSIBLE MANAGER CHANGE AT EPS LEVEL CHANGING ALL WBS ELEMENTS
  • 30173125 REPORTS: UNABLE TO RUN 'AUDIT DATA - PROJECT' REPORT
  • 30146111 FP BUG 29901041 - ACTIONS, APPLY ACTUALS WINDOW DOES NOT APPEAR FOR JUST ONE USER
  • 30133910 FP - BUG 29666480 - RISK EXPOSURE NOT CALCULATING CORRECTLY OR AT ALL
  • 30106680 COMPLEX QUERIES CAUSE UNSYNCHRONIZATION IN MANAGE PORTFOLIO PAGE
  • 30072035 FROM RESOURCE DICTIONARE CHANGING OF PRIMARY ROLE IN COLUMN IS NOT SAVING
  • 28476028 FILTER FOR NOT EQUAL TO A RESOURCE TEAM MISSING RESOURCES NOT ON A TEAM
  • 27544643 PORTFOLIOS ARE NOT REFRESHED AUTOMATICALLY IN RESOURCE ANALYSIS PAGE

P6 CLIENT

  • 30240141 EXCLUSION OF CHILD WBS SUMTASK RECORDS DURING P6PRO LOGIN
  • 30023520 DUTCH TRANSLATION TRUNCATION ISSUES WITH P6 PRO
  • 30266996 PERFORMANCE DEGRADATION IN P6 PROFESSIONAL WHEN ACTIVITY LAYOUT CONTAINS LARGE COLLAPSEDELTAS PROPERTY DATA
  • 30240072 CANNOT PUBLISH PROJECT WEBSITE WHEN USING UNC PATH
  • 30133323 P6 WEB - OPTION MENU RENAME COLUMN STAYS DISPLAYED
  • 30005821 EXTRA JAPANESE CHARACTERS ARE IMPORTED VIAEXCEL

TEAM MEMBER

  • 30203851 TEAM MEMBER NOT SUPPORTING LOGOUT URL UNDER P6 WEB CONFIGURATION > APPLICATION SETTING
  • 30035599 THE PREFIX 'UTF-8' IS INSERTED TO THE NOTEBOOK TOPIC DESCRIPTION AFTER IT IS UPDATED IN TEAMMEMBER

SRVS

  • NA
29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.4.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.4.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 28963875 RESOURCE ASSIGNMENTS=>EXPORT TO BE DISABLED IN GRID AND GANTT VIEW
  • 28963509 NF: PROJECT>ASSIGNMENTS>MULTIPLE FILTERS=> DOWNLOAD FILE HAS NO DATA
  • 28924111 REPORTS NOT SHOWING PROPERLY IN REPORTS TAB OF P6 WEB AFTER UPGRADE
  • 28899145 FP-BUG 28867711 - MY PREFERENCE TIME UNIT DECIMAL NOT COPIED WITH USER
  • 28871614 IO ERROR: REMOTE HOST CLOSED CONNECTION DURING HANDSHAKE FROM DBCONFIGPV
  • 28866840 SLOW FILL DOWN PERFORMANCE ON STANDARD (HTML) VIEWS
  • 28848912 UNABLE TO SAVE SET PROJECT PREFERENCES
  • 28831326 COPY OR BASELINE SCHEDULES JOB SERVICE HANGS
  • 28765285 SCHEDULE CHECK NOT WORKING
  • 28746019 PREFIX IS ADDED TO THE AVAILABLE CODES IN SEARCH OF RESOURCES CODES ASSIGNMENT
  • 28630870 DURING IMPORT XML A USER WITH RESTRICTED ACCESS UNABLE TO SELECT CHILD EPS NODE
  • 28615649 IS IT POSSIBLE TO SET DEFAULT SECURITY POLICY TO SHARED WHEN USING WCC
  • 28559679 LAST ACTIVE TIME COLUMN VALUE IS NOT CORRECT IN USER SESSIONS PAGE
  • 28107298 TEAM MEMBER FILTER SAVE BUTTON DOESN'T ACTIVATE AFTER ADDING A NEW FILTER
  • 28018904 START DAY IS MOVED 1 DAY AHEAD WHEN IMPORTING A XML IN MSP
  • 27803843 PROJECTS > ASSIGNMENTS, SPREADSHEET VIEW DOUBLE ARROWS TO SEE MORE
  • 26496253 LINKS IN NOTEBOOKS HTML5 VIEW CANNOT BE OPENED USING INTERNET EXPLORER OR CHROME
  • 26082559 INTERNAL:BUG 26076403 - DATA IS INCORRECT IN XML IMPORT
  • 25928478 MANAGE VIEWS - GANTT AND GRID VIEW, SHOULD BE SAVED AS A PART OF VIEW

P6 CLIENT

  • 28816140 ZIP DOES NOT CONTAIN A VALID .XML IMPORT FILE ERROR DURING IMPORT (EPPM CLIENT)

  • 27983660 MSP XML EXPORT CANNOT IMPORT INTO MSP DUE TO UID'S OVER 1048000
  • 28979260 VTFIO-3898-C WHEN ADDING ACTIVITY RESOURCE ASSIGNMENTS IN GLOBAL CHANGE
  • 28574580 EACCESSVIOLATION - AVAA0-1165-E WHEN OPENING AND CLOSING PROJECT
  • 28714747 MIGRATE.BAT ALLOWS CUSTOMER TO RUN DB MIGRATION FOR SCHEMA MIGRATION
  • 27892271 JAPANESE CHARACTER DID NOT DISPLAY PROPERLY ON GANTT CHART
  • 28891099 LOGIN TO P6 PROFESSIONAL SUCCESSFUL WITH NO PASSWORD USING LDAP
  • 28545416 UNABLE TO CONNECT TO THE DATABASE.. CLICKING DISCONNECT >RECONNECT WITH SSO
  • 27478392 CLIENT SIDE CACHING NOT WORKING, LOSS OF DATA

 Team Member

  • 28892063 USER CAN MARK ACTIVITY AS COMPLETE IN TEAM MEMBER BUT CANNOT ENTER TIME AFTER CLICKING THE COMPLETE CHECK SYMBOL
  • 28799087 PRE 188: MISSING STAR ICON ON PRIMARY RESOURCE ONLY ACTIVITY RECORD AND TM FILTER ACTIVITY RECORD
  • 28798281 PRE 188: IN TMWEB, TIMESHEETS UPDATE ACTUAL START DATE TO A PREVIOUS DATE, CELLS SHOULD BE EDITABLE FROM ACTIVITY START DATE NOT
  • ASSIGNMENT START DATE
  • 28798166 PRE 188:ISSUE IN THE VALUE OF ACTIVITY ACTUAL START DATE AND ASSIGNMENT ACTUAL START DATE IN P6 WHEN USING TIMESHEETS>UPDATE DATES FROM TM WEB

SRVS

  • 28749446 FAILED TO EXPORT PROJECT TO MSP XML FILE DUE TO HUGE MEMORY (22+GB) CONSUMPTION ON DB SERVER
  • 28291511 DD + (VALUE) OVER DAYLIGHT SAVINGS TIME CAUSES ISSUE USING SERVICES.

ADMIN

  • 28528274 SCRUB USERNAME BIP SETTING IN P6 ADMINISTRATION

API

  • 28623057 ACTIVITY COST IS NOT GETTING CALCULATED WHEN ACTIVITY % COMPLETE IS 100%

Oracle Primavera P6 18.8.3.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.3.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 28823662 REG1883- ADMIN.JSP PAGE TRIES TO LOGIN FOR THE DUPLICATE DB INSTANCE INSTEAD OF BOOTSTRAP DB

  • 28806670 SOME PROJECT PUBLICATION JOBS NEVER COMPLETE AND CAUSE PERFORMANCE ISSUES

  • 28784227 ACTUAL START AND ACTUAL FINISH DATES DO NOT MATCH WHAT IS IN P6

  • 28722021 UNKNOWN ERROR WHEN ACCESING THE PORTFOLIOS TAB

  • 28714072 FIELDS ARE BLANK IN P6 WEB WITH CERTAIN ACTIVITY VIEWS

  • 28679949 EV PUBLICATION DATA CALCULATED FOR ACTIVITIES W/ NO PROGRESS USING WEEKLY SPREAD

  • 28611112 WHEN RUNNING 'USER INATCIVITY REPORT' LAST_LOGIN (SERVER TIME) IS BLANK

  • 27619247 TRANSACTION (PROCESS ID 65) WAS DEADLOCKED ON LOCK - RESOURCE ROLE PUBLICATION

  • 25889437 PRE175:SEARCH CRITERIA COLUMN NOT FUNCTIONAL IN ACTIVITIES ASSIGNMENT TAB

P6 CLIENT

  • 28816140 ZIP DOES NOT CONTAIN A VALID .XML IMPORT FILE ERROR DURING IMPORT (EPPM CLIENT)

  • 28714440 SYSTEM.IO.FILENOTFOUNDEXCEPTION: COULD NOT FIND FILE DURING MSP XML EXPORT

  • 28546588 PROBLEM WITH EARNED VALUE PERIOD PERFORMANCE CALCULATION

  • 28484197 IMPORT OF XML FAILS IF TMP DIRECTORY POINTS TO A DIRECTORY WITH A SPACE IN IT

  • 28461581 VISUALIZER MULTIPLE GROUP BY DATA DISAPPEARS WHEN INDENT IS CHECKED

  • 28449658 EDIT TEMPLATE DURING XML IMPORT TAKES A LONG TIME TO LOAD

 Team Member

  • 28771596 CHANGING ACTIVITY % COMPLETE IN TEAM MEMBER CALCULATES REAMINING DURATION WRONG

  • 28759308 NO MATCHING ACTIVITY FOUND FOR OBJECT ID XXXXXX

  • 28642027 WBS NAME FILTERING - MULTIPLE WBS NODES WITH THE SAME NAME

SRVS

  • 28771605 "NOSUCHFIELDERROR" WHEN LOADING CBSCODE IN RESOURCEASSIGNMENT IN API

ADMIN

  • 28751043 DUPLICATE PROJECT IDS AFTER COPY/PASTE OR JAVA IMPORT (SAME ID - DIFFERENT CASE)-FP

Oracle Primavera P6 18.8.2.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.2.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 28715013 CAN'T MODIFY UNIT OF MEASURE

  • 28692039 FP-BUG-28554335 - PLACEMENT OF CURRENCY SYMBOL DISREGARDED IN STANDARD VIEW

  • 28673764 MISSING DATA IN PAUDIT TABLE

  • 28637923 TEAM MEMBER FILTER PICKLIST CAUSING BROWSER/REQUEST HANG

  • 28617746 PROJECT UDF DATA IS MISSING FROM DOWNLOADED XLS

  • 28607462 INCORRECT RESULTS WHEN USING MULTIPLE FILTERS WITH ANY APPLIED CRITERIA

  • 28600953 REMAINING DURATION AND COMPLETE % DON'T FOLLOW LOGIC IN STATUS UPDATE OVERRIDE

  • 28600581 FPBUG-28388949-COST ACCOUNTS IN EPPM DO NOT ADHERE TO ENTERPRISE COST SORT ORDER

  • 28599780 NESTED FILTER CRITERIA DOES NOT HONOR MATCH ANY AND MATCH ALL CRITERIA

  • 28580799 GLOBAL SEARCH AND REPLACE ERROR FOR SEARCH CRITERIA ON PROJECT CODE AND UDF

  • 28567376 DUPLICATE CBS CODES ARE NOT IMPORTED CORRECTLY INTO P6 HIERARCHY

  • 28547373 NON-WORK DAYS INCORRECT IN YEARLY VIEW (GLOBAL CALENDARS)

  • 28517732 NON<ADMSUPERUSER> ABLE TO MODIFY OTHER USER TO PRIVILEGE PSP:PROJECT SUPERUSER

  • 26374912 TEAM MEMBER FILTER TAKING LONGER TIME TO LOAD ON HIGH VOLUME DATABASE

  • 28314701 OVERHEAD ONLY TIMESHEET NOT CLEARING FROM APPROVAL QUEUE

P6 CLIENT

  • 28669283 THE REMOVED FEEDBACK TAB FROM ACTIVITIES DETAILS PANEL COMES BACK

  • 28507343 ADDITIONAL UPDATE BASELINE MENU OPTION IN P6 PROFESSIONAL UNDER TOOLS MENU ITEM

  • 27925969 GROUP BANDS IN VISUALIZER DO NOT MATCH THE ORDER IN ENTERPRISE>ACTIVITY CODES

  • 28672065 COPY AND PASTING FROM THE RESOURCE ASSIGNMENTS PAGE TIMESCALE IS INCORRECT

  • 28672142 DIFFICULT TO DRAG AND MOVE A WBS ELEMENT FROM ITS CURRENT PARENT NODE TO ANOTHER

 Team Member

  • 28399525 TIMES SELECTED ARE CHANGED WITH RESPECT TO SERVER TIME ZONE

SRVS

  • 28607570 FP UNABLE TO COPY ACTIVITY CODE WITH SECURE CODE SETTING USING ACTIVITYSERVICE

ADMIN

  • 28672427 NEED ADDITIONAL POPULATE_UACCESS FIX TO HANDLE MORE OBSPROJ ISSUES

  • 28561853 ORPM_RESET_PRIV.SQL DOES NOT EXECUTE AT END OF MIGRATION

Oracle Primavera P6 18.8.1.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.1.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 28543202 TEAM MEMBER LOGOUT URL FAILS WITH 404 NOT FOUND ERROR WHEN IT CONTAINS A ?

  • 28538791 SELECT BUTTON IN OBS DIALOG BOX IS GREYED OUT.

  • 28529604 FP PARAMETERS FROM P6 TO BI PUBLISHER NOT PARSED CORRECTLY

  • 28493618 FP-MIGRATE.BAT COULD NOT REUSE EXISTING TABLESPACE

  • 28473105 'UNABLE TO SAVE CHANGE' WHILE ADDING RESPONSE ACTION

  • 28574985 ACTIVITIES PAGE DOES NOT LOAD

  • 28443657 DELETING BASELINE OF A PROJECT WITH DOCS DELETES DOCS USING COLLAB SYNC SERVICE

  • 28438080 TRYING TO ASSIGN A RISK MATRIX TO THE PROJECT BUT NOT ABLE TO SEE THE PROJECT

  • 28428653 PROJECT ARBITER SETTINGS DO NOT ALWAYS UPDATE

  • 28400300 NEW CALENDARS DO NOT INHERIT EXCEPTION TIME IN P6 WEB

  • 28343769 ERROR: UNABLE TO LOAD DATA.. WHEN LOADING EPS PAGE

  • 28300342 LAG IN DAYS DOES NOT CALCULATE CORRECTLY IN STANDARD VIEW.

  • 28040417 P6 OUTPUT FOR A MULTIPLE TEXT PARAMETER CUTS OFF AFTER FIRST VALUE

  • 27610537 17.12.1 PATCH UTILITY FAILS WHEN WEBLOGIC PASSWORD CONTAINS SPECIAL CHARACTERS

  • 27264911 UNABLE TO CHECK 'HIDE IF EMPTY' WHEN USING MULTIPLE GROUPING BANDS

  • 28423838 COPY/PASTE IS NOT WORKING FOR ACTIVITIES ASSIGNED WITH PREDECESSOR/SUCCESSOR

P6 CLIENT

  • 28485598 UNABLE TO VIEW/UPDATE PROJECT LAYOUT FILTERS WITHOUT GLOBAL PRIVILEGES

  • 28483918 USER PREFERENCES CAUSING USER TO NOT BE ABLE TO LOGIN

  • 28268233 LARGE XER IMPORT IN PVD FAILS WITH ERROR \TSCLIENTC IS NOT ACCESSIBLE.

  • 28536030 CHANGE THE FLAG IN PM WHEN READING THE REGISTRY FROM KEY_ALL_ACCESS TO KEY_READ

  • 28477881 DEFAULT IMPORT TEMPLATE NAME SHOULD NOT BE EDITABLE FOR P6 XML IMPORT

  • 28446230 CLOUDCONNECT HEAP MEMORY USAGE INCREASES OVER TIME DUE TO MEMORY LEAK

  • 28392281 COPY/PASTE PROJECT DOES NOT DELETE PRIMARY RESOURCE WHEN IT IS NOT SELECTED

  • 28181000 EXTERNAL SUCCESSORS MISSING IN DETAILS PANE

  • 28368161 P6PROCLOUDCONNECT SERVERS CONTINUALLY LOCK UP WITH STUCK THREADS

  • 27948468 AFMGS-1536-0 WHEN ADDING THE RISK COLUMNS PRE/POST DATES IN THE P6 CLIENT

 Team Member

  • 28547031 AND SHOW UP AS &#X27 OR A BOX IN TIMESHEET NOTES
  • 28444919 TIMESHEET EXPANDED ASSIGNMENTS OVERTIME AREA DRAWS INCORRECTLY

SRVS

  • 28367094 READ PERIODATCOMPLETIONCOST FOR RESOURCEASSIGNMENT

Oracle Primavera P6 18.8.8.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.8.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29607835 AF-2235-SWEDISH CHARACTERS REMOVED FROM PDF EXPORT
  • 29507043 P6 WEB ACTIVITY PAGE FAIL TO LOAD WHEN SHOW FIELD ROLLUPS ENABLED IN GROUPING
  • 29501722 P6 WEB RESOURCE ANALYSIS ERROR 'UNABLE TO LOAD ANALYSIS PICKER DATA'
  • 29413210 IMPORT XML IN P6 R18.8 WEB WITH SQL SERVER DB FAILS WHEN PROJECT ID CONTAINS CLOSING SQUARE BRACKET
  • 29380445 WEB DASHBOARD PORTLET IS NOT DISPLAYING ROLLUP DATA
  • 29349346 USER PORTFOLIO CANNOT BE SELECTED AS A DASHBOARD FILTER

P6 CLIENT

  • 29511866 PM.EXE IS NOT RESPONDING WHEN IMPORTING THE LARGE SPREADSHEET XLSX
  • 29489026 UNABLE TO EXPORT OR IMPORT XLSX COST ACCOUNT HIERARCHY CORRECTLY
  • 29468671 XML IMPORT FAILES WITH SEVERE: FOR INPUT STRING: 6.000 JAVA.LANG.NUMBERFORMATEXCEPTION
  • 29445474 IMPORT MSP XML (THAT WAS EXPORTED FROM P6) ERROR INTO P6 PPM WITH MSSQL DATABASE (NOT SQLITE)
  • 29322523 PROJECT AUTOMATICALLY DELETED WHEN IMPORTED A .XER PROJECT
  • 29312308 XML IMPORT => OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT.
  • 28895257 XML IMPORT FAILS WITH PRISM.MODULARITY.MODULEINITIALIZEEXCEPTION: AN EXCEPTION OCCURRED WHILE INITIALIZING MODULE 'COMMANDLINEMODULE'.
  • 28042419 VISUALIZER LAYOUT DISPLAYS INCORRECTLY FOR MANY USERS
  • 29596670 SQL SERVER DATABASE LOCKS CAUSING USER WAITS
  • 29551315 FP-BUG 29028404 - XML IMPORT FILE SIZE LIMIT / XML BLOATING
  • 29549937 WHEN CREATING A BASELINE OR COPY THE EXISTING PROJECT IT REMOVES ALL OF THE ACTIVITIES
  • 29440488 UNABLE TO COMMUNICATE WITH THE SERVER. APPLICATION WILL TERMINATE NOW - NO CLIENT-SIDE CACHE
  • 20611641 INTEGRITY CHECK #117 NOT REALLY A FOREIGN KEY VIOLATION
  • 29502396 ERROR: ONLY ONE DRIVING PROJECT IS PREMISSIBLE PER FILE. IMPORTING XML PROJECT USING P6 INTEGRATION API
  • 29347259 FP BUG-BUG 29061786 - USER ADMINISTRATION PAGE LOADS SLOW FOR NON-ADMIN SUPERUSER

TEAM MEMBER

  • 29356663 BUSINESS RULE VIOLATION ALERTS BLOCKED USING IIS WEB SERVER CUSTOM ERROR CONFIGURATION
  • 29246513 TEAM MEMBER MY ACTIVITIES PAGE NEVER STOPS
  • 26525952 CANNOT ENTER VALUES GREATER THAN 10,000 IN TEAM MEMBER
  • 26375799 FP: FIELD ENTRY LIMIT OF 10,000 FOR REMAINING UNITS IN TEAM MEMBER

INTG

  • 29551485 FP-BUG 29487453 - PROJECT ARBITER STUCK DUE TO DATABASE CONNECTIVITY ISSUE
  • 27342440 FP:BUG 26822424 - PERFORMANCE DEGRADATION ON READACTIVITIES OPERATION AFTER UPGR
  • 29290211 INCORRECT VALUE RETURNED FOR PLANNEDVALUECOST FIELD USING ACTIVITYSERVICE
  • 29518276 FP-SCHEDULED SERVICE USE SERVICE'S RUN TIME OPTION TO CHANGE DD DOES NOT IGNORE SECONDS

Oracle Primavera P6 18.8.9.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.9.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29707616 EPS ACTIVITY CODE NOT SHOWING VALUES IN ENTERPRISE DATA BUT SHOWS IN PROFESSIONAL
  • 29698765 INCONSISTENT RESULTS CLICKING CODE VALUE THEN HIT DELETE TO REMOVE SELECTION
  • 29675193 P6 PRO CLIENT LIVE DATA VS WEB DATA DISCREPANCIES-WEB FIXES
  • 29675107 PATCH INQUIRY: PATCH SET 16.2.13.0 VS. PATCH SET 18.8.2.1
  • 29668954 RESOURCE REQUEST DETAILS DO NOT DISPLAY CORRECTLY ON IE11
  • 29654254 FP REPORTS STUCK IN THE RUNNING STATUS WHEN RUN FROM P6WEB.
  • 29635496 UNITS FOR MATERIAL RESOURCES ARE CONVERTED TO DURATION UNITS (DAYS) IN THE P6 WEB ASSIGNMENTS VIEWS
  • 29620622 'LOGIN LOCKOUT DURATION' DOES NOT WORK
  • 29598403 DISSOLVE OPTION ENABLED FOR USERS WITHOUT DELETE ACTIVITY PRIVILEGE
  • 29595446 FP - BUG 28718772 - 'INVALID PATH WAS REQUESTED' WHILE CLICK VIEW LOG IN NOTIFICATION BOX
  • 29590436 P6 WEB 'ALL PROJECTS USE THEIR OWN DATA DATE' SETTING NOT SAVED
  • 29587967 GROUPING BY PROJECT USING DESCENDING DOES NOT WORK.
  • 29460126 NEW COST IMPACT BY VALUE RISK THRESHOLD CANNOT SAVE
  • 29449526 CIRCULAR RELATIONSHIP ERROR WHEN CREATING FIRST PRED LINK TO START MILESTONE
  • 29154039 REPORTS DISPLAYING IN P6 OUTSIDE OF PROPER FOLDER
  • 28993855 FILTER CHANGES NOT SHOWING UNTIL MANUAL REFRESH

P6 CLIENT

  • 29712512 SQLITE PPM IMPORT XML ERROR OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT
  • 29671011 ERROR: OBJECT REFERENCE NOT SET TO AN INSTANCE OF AN OBJECT. IMPORTING MSP XML
  • 29653189 LEVELING PRIORITY OPTION IS NOT CORRECTLY IMPORTED FROM XER FILE
  • 29652900 COPYING RESOURCE USAGE SPREADSHEET DATA FROM ACTIVITIES VIEW PASTES 14 COLUMNS TO EXCEL
  • 29652881 JAPANESE ACTIVITY CODE CANNOT IMPORT INTO P6 WHEN CHANGING ACTIVITY CODE ORDER
  • 29353658 DUPLICATE RECORDS IMPORTED INTO PROJWBS
  • 29653207 FILTERS THAT USE TYPE-IN INFO PULLS UP A PICKER BOX INSTEAD OF MANUAL TYPE
  • 29652954 ERROR CONVERTING DATA TYPE NVARCHAR TO NUMERIC
  • 29413245 HANGS AT CLEANING UP WBS.... 30% WHEN IMPORT XER
  • 29688598 P6 PROFESSIONAL SQLITE DATABASE IMPORTING MSP XML FILES DROPS ALL RELATIONSHIP TYPES
  • 29715534 ORA-06502: PL/SQL: NUMERIC OR VALUE ERROR: INVALID LOB LOCATOR SPECIFIED: ORA-22275 WHEN USING DBSETUP
  • 29636489 ADJUST USESSION_CLEANUP TO TIMEOUT WHEN UPDATING ROWS LOCKED BY ANOTHER PROCESS

TEAM MEMBER

  • 29746501 TEAM MEMBER ASSIGN TASKS GETS TEAMMEMBER_ERROR_GENERIC
  • 29675837 IRREGULAR BEHAVIOR WHEN UPDATING ACTIVITIES IN TEAM MEMBER
  • 29426021 FP BUG-BUG 29235741 - TIMESHEETS ALLOWED TO BE SUBMITTED WITH NO ENTRIES OR WITH ZERO HOURS

SRVS

  • 29626309 FP BUG 29556756 - BO EXCEPTIONS NOT HANDLED PROPERLY IN UPDATE BASELINE
  • 29603337 FP BUG -BUG 29050757 - WEB SERVICE INITIATED SCHEDULE JOB HANG
  • 29591128 COPY/PASTE CREATES NEW PROJECT TASK_IDS IN DESCENDING ORDER COMPARED TO SOURCE
  • 29715183 IMPORT CODE NO LONGER WORKS AFTER UPGRADING FROM 18.8.3 TO 18.8.8
  • 29586215 P6WS NAMESPACE PREFIX WAS CHANGED FROM HTTP TO HTTPS

Oracle Primavera P6 18.8.10.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.10.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29825647 USESSAUD KEEPINTERVAL DISPLAYS INCORRECTLY IN P6 APPLICATION SETTINGS WHEN OTHER KEEPINTERVAL SETTINGS EXIST
  • 29776573 P6 WEB PROJECT PREFERENCES HANGS FOR PROJECT INTEGRATED WITH UNIFIER
  • 29746393 UPDATING FIELD ACTIVITYOWNERUSERID FAILED FOR ACTIVITY <ACTIVITY ID> IN PROJECT <PROJECT ID> BECAUSE FOR INPUT STRING:
  • 29686772 P6 WEB RISKS COST COLUMN SHOWS DOLLAR SIGN NO MATTER WHICH CURRENCY IS SELECTED
  • 29516628 REMAINING DURATION CHANGES WHEN IMPORTING VIA XML
  • 29438077 P6 WEB SAVE TO PDF IS FAILING WITH MULTIPLE ERRORS
  • 29361393 SQL SERVER IMPLEMENTATION OF BUG 27629063 - PX SERVICE ON RSRCROLEASGNMENTSPREAD TABLE
  • 26973761 AF-1683 - SAVE TO PDF BUTTON GREYED OUT IN EPPM PRINT
  • 29837323 IN EXCHANGE DATA MENU GATEWAY INTEGRATIONS ARE ORDERED DIFFERENTLY IN P6 WEB VS CLIENT
  • 29820167 UPGRADE/MIGRATION SCRIPTS REFERENCE DBMS_REPUTIL.FROM_REMOTE WITHOUT IF/ELSE STATEMENT

P6 CLIENT

  • 29804314 HINT HELP POP UP DOES NOT DISPLAY IF LOGGED IN WITH NON-ENLGISH LANGUAGE
  • 29664685 P6PROCLOUDCONNECT 18.8.7.0 THROWS INVALID DATABASE ERROR TRAVERSING PROXY WITH EXCLUSIONS
  • 29548077 PRINTING TO XPS ONLY PRINTS IN PORTRAIT
  • 29854012 FP WHEN ATTEMPTING TO IMPORT A MICROSOFT XML INTO P6 CONFIGURED FOR GERMAN REGIONAL SETTINGS WITH A IMPORT TEMPLATE CREATED IN GERMAN, IMPORT FAILS THE FOLLOWING
  • ERROR OCCURS IN THE LOG FILE
  • 29803683 ACTUAL THIS PERIOD DOES NOT UPDATE WHEN ACTIVITY STATUSED
  • 29661818 MERGING REFLECTIONS CAUSES UNIFIER PROJECT SETTINGS AND CBS CODES TO BE LOST
  • 29624860 ERROR: EVENT CODE AVAA0-0464-4 WHEN ASSIGNING PRIMARY RESOURCE TO MILESTONE

TEAM MEMBER

  • 29859886 P6 MOBILE LOGIN FAILS ON IOS DEVICES WHEN PORT 443 IS INCLUDED IN HTTPS URL
  • 29790522 TIMESHEET ENTRY FIELDS DISABLED WHEN MANUALLY ADDING ACTIVITIES

SRVS

  • 29835168 FP - BUG 29564582 - IMPORTPROJECTASYNCASAP DOES NOT WORK WITH GZIP OR ZIP FILE TYPE
  • 29795559 FP BUG-BUG 29725230 - JAVA.LANG.OUTOFMEMORYERROR: JAVA HEAP SPACE WHEN EXPORTING LARGE PROJECT USING P6 WEB SERVICES

Oracle Primavera P6 18.8.11.0 Released

 

IMPORTANT UPDATE: The major patch 18.8.11.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

WEB

  • 30005966 PROBLEM WITH A QUERY DURING PROJECT PUBLICATION
  • 29997876 FAILED TO SET ID VALUE -XXXX ON BUSINESSOBJECT. JAVA.LANG.CLASSCASTEXCEPTION
  • 29993587 FILTER BY DOES NOT WORK FOR CUSTOMIZING THE VIEWS OF RESOURCE ANALYSIS
  • 29962211 PORTFOLIO WITH FILTERS SAVE ERROR: UNABLE TO SAVE CHANGES
  • 29922321 UPDATING RISK RESPONSE PLAN > RESPONSE ACTION > OWNER FIELD DOES NOT SAVE
  • 29877974 PROJECTS LISTED IN P6 WEB REPORTS INCLUDED PROJECTS THAT DO NOT MATCH SEARCH CRITERIA
  • 29480709 MUST REFRESH THE DOCUMENTS PAGE MULTIPLE TIMES TO SEE DOCUMENTS

P6 CLIENT

  • 29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
  • 29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
  • 29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
  • 29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
  • 29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
  • 30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
  • 29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
  • 29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
  • 29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
  • 29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
  • 29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
  • 29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
  • 29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
  • 29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
  • 29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
  • 29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
  • 29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
  • 29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
  • 29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
  • 29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

TEAM MEMBER

  • 29894360 BEHAVIOR DIFFERENCE WHEN ADDING ACTIVITIES TO TIMESHEET AUTOMATICALLY VS MANUALLY
  • 29880487 FP BUG 29598607 - TS_ADUIT TABLE CONTAINS 2 ENTRIES FOR THE SAME RESOURCE TIMESHEET APPROVAL

SRVS

  • 29922444 FP-BUG 29260656 - WEB SERVICES QUERY WITH LARGE IN CLAUSE IMPACTS SYSTEM PERFORMANCE
  • 29883433 STUCK THREADS IN P6 WEB SERVICES WHEN CREATING WBS
29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER

Oracle Primavera P6 18.8.12.0 Released

IMPORTANT UPDATE: The major patch 18.8.12.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 30171768 PORTFOLIO SELECTION AND THE DEFINITION DISPLAY ARE NOT SYNCHRONIZED IN MANAGE PORTFOLIO PAGE
  • 30146966 WEB: EDIT OPTION FOR HEADER AND FOOTER DOESN'T WORK FOR SAVE TO PDF FUNCTION
  • 30144890 RA VIEW IN WEBPM NOT GROUPING BY HEIRARCHY
  • 30133428 SEARCH CRITERIA NOT PRESENT ON RESOURCE REQUEST
  • 30115680 FIX THE OUTPUT OF CLEAN_PX_DELETE PROCEDURE
  • 30100877 MIGRATE.BAT TOOL DOES NOT PRODUCE ERROR IF THE HEAP IS NOT LARGE ENOUGH
  • 30099100 BUTTONS ARE PLACED TO IMPROPER POSITION ON THE WEB PAGES
  • 30082179 P6 WEB ACCESS FRENCH SET LANGUAGE LOGIN RESULTS IN ADD USERS DIALOG TO FLICKER AND RESIZE CONTINUOUSLY.
  • 30077660 PRIMARY ROLE IS NOT SHOWING ANY DATA IN ASSIGNED RESOURCES WINDOW
  • 30073857 USERS WITHOUT DELETE PROJECT DATA WITH TIMESHEET ACTUALS PRIVILEGE CAN DELETE ACTIVITIES WITH TIMESHEET ACTUALS
  • 30038833 CHARACTER USED IN PORTFOLIO FILTER CAUSES THE FILTER TO NOT BE DISPLAYED WHEN CLICKING ON IT LATER
  • 30001266 P6WEB APPROVALS STATUS UPDATES DOES NOT LOAD.
  • 29964558 HIERARCHY OF ACTIVITY CODES NOT SHOWN COMPLETELY WITH ALL LEVELS IN P6 WEB CLIENT
  • 29698457 SLOW PERFORMANCE OF LOADING THE CUSTOMIZED DASHBOARD
  • 29663298 ERROR: SELECTED ROLE DOES NOT HAVE PUBLISHED DATA. PUBLISH PROJECT TO VIEW DATA
  • 29624144 ADVANCED OPTIONS IN IMPORT TEMPLATE IGNORED WHEN IMPORTING XML WITH BASELINE

P6 CLIENT

  • 30033748 ACTIVITY CODES ARE NOT IMPORTED FROM XML
  • 29946592 ERROR 'NO SUCH COLUMN: UV.TABLE_NAME OCCURS' WHEN LOGIN P6 CLIENT WITH CSC ENABLE
  • 29668606 FP BUG - BUG 29620775 - APPEARS POSSIBLE TO DELETE A PROJECT VIA P6 WEB EVEN IF SOMEONE ELSE HAS SAME PROJECT OPEN
  • 30112237 FP - DAMON IS NOT GETTING EXECTED BY DBMS SCHEDULER

TEAM MEMBER

  • 29670161 MY ACTIVITIES AND TIMESHEETS PAGES ARE BLANK IN TEAM MEMBER AND BROWSER DEVELOPER TOOL CAPTURES ERROR: MISMATCHED ANONYMOUS DEFINE() MODULE...

SRVS

  • NA

Oracle Primavera P6 Professional 18.8.12

29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER