IMPORTANT UPDATE: The major patch 18.8.3.0 for P6 EPPM is now available. The following list of patches have been added for Primavera
WEB
-
28823662 REG1883- ADMIN.JSP PAGE TRIES TO LOGIN FOR THE DUPLICATE DB INSTANCE INSTEAD OF BOOTSTRAP DB
-
28806670 SOME PROJECT PUBLICATION JOBS NEVER COMPLETE AND CAUSE PERFORMANCE ISSUES
-
28784227 ACTUAL START AND ACTUAL FINISH DATES DO NOT MATCH WHAT IS IN P6
-
28722021 UNKNOWN ERROR WHEN ACCESING THE PORTFOLIOS TAB
-
28714072 FIELDS ARE BLANK IN P6 WEB WITH CERTAIN ACTIVITY VIEWS
-
28679949 EV PUBLICATION DATA CALCULATED FOR ACTIVITIES W/ NO PROGRESS USING WEEKLY SPREAD
-
28611112 WHEN RUNNING 'USER INATCIVITY REPORT' LAST_LOGIN (SERVER TIME) IS BLANK
-
27619247 TRANSACTION (PROCESS ID 65) WAS DEADLOCKED ON LOCK - RESOURCE ROLE PUBLICATION
-
25889437 PRE175:SEARCH CRITERIA COLUMN NOT FUNCTIONAL IN ACTIVITIES ASSIGNMENT TAB
P6 CLIENT
-
28816140 ZIP DOES NOT CONTAIN A VALID .XML IMPORT FILE ERROR DURING IMPORT (EPPM CLIENT)
-
28714440 SYSTEM.IO.FILENOTFOUNDEXCEPTION: COULD NOT FIND FILE DURING MSP XML EXPORT
-
28546588 PROBLEM WITH EARNED VALUE PERIOD PERFORMANCE CALCULATION
-
28484197 IMPORT OF XML FAILS IF TMP DIRECTORY POINTS TO A DIRECTORY WITH A SPACE IN IT
-
28461581 VISUALIZER MULTIPLE GROUP BY DATA DISAPPEARS WHEN INDENT IS CHECKED
-
28449658 EDIT TEMPLATE DURING XML IMPORT TAKES A LONG TIME TO LOAD
Team Member
-
28771596 CHANGING ACTIVITY % COMPLETE IN TEAM MEMBER CALCULATES REAMINING DURATION WRONG
-
28759308 NO MATCHING ACTIVITY FOUND FOR OBJECT ID XXXXXX
-
28642027 WBS NAME FILTERING - MULTIPLE WBS NODES WITH THE SAME NAME
SRVS
- 28771605 "NOSUCHFIELDERROR" WHEN LOADING CBSCODE IN RESOURCEASSIGNMENT IN API
ADMIN
IMPORTANT UPDATE: The major patch 18.8.2.0 for P6 EPPM is now available. The following list of patches have been added for Primavera
WEB
-
28715013 CAN'T MODIFY UNIT OF MEASURE
-
28692039 FP-BUG-28554335 - PLACEMENT OF CURRENCY SYMBOL DISREGARDED IN STANDARD VIEW
-
28673764 MISSING DATA IN PAUDIT TABLE
-
28637923 TEAM MEMBER FILTER PICKLIST CAUSING BROWSER/REQUEST HANG
-
28617746 PROJECT UDF DATA IS MISSING FROM DOWNLOADED XLS
-
28607462 INCORRECT RESULTS WHEN USING MULTIPLE FILTERS WITH ANY APPLIED CRITERIA
-
28600953 REMAINING DURATION AND COMPLETE % DON'T FOLLOW LOGIC IN STATUS UPDATE OVERRIDE
-
28600581 FPBUG-28388949-COST ACCOUNTS IN EPPM DO NOT ADHERE TO ENTERPRISE COST SORT ORDER
-
28599780 NESTED FILTER CRITERIA DOES NOT HONOR MATCH ANY AND MATCH ALL CRITERIA
-
28580799 GLOBAL SEARCH AND REPLACE ERROR FOR SEARCH CRITERIA ON PROJECT CODE AND UDF
-
28567376 DUPLICATE CBS CODES ARE NOT IMPORTED CORRECTLY INTO P6 HIERARCHY
-
28547373 NON-WORK DAYS INCORRECT IN YEARLY VIEW (GLOBAL CALENDARS)
-
28517732 NON<ADMSUPERUSER> ABLE TO MODIFY OTHER USER TO PRIVILEGE PSP:PROJECT SUPERUSER
-
26374912 TEAM MEMBER FILTER TAKING LONGER TIME TO LOAD ON HIGH VOLUME DATABASE
-
28314701 OVERHEAD ONLY TIMESHEET NOT CLEARING FROM APPROVAL QUEUE
P6 CLIENT
-
28669283 THE REMOVED FEEDBACK TAB FROM ACTIVITIES DETAILS PANEL COMES BACK
-
28507343 ADDITIONAL UPDATE BASELINE MENU OPTION IN P6 PROFESSIONAL UNDER TOOLS MENU ITEM
-
27925969 GROUP BANDS IN VISUALIZER DO NOT MATCH THE ORDER IN ENTERPRISE>ACTIVITY CODES
-
28672065 COPY AND PASTING FROM THE RESOURCE ASSIGNMENTS PAGE TIMESCALE IS INCORRECT
-
28672142 DIFFICULT TO DRAG AND MOVE A WBS ELEMENT FROM ITS CURRENT PARENT NODE TO ANOTHER
Team Member
- 28399525 TIMES SELECTED ARE CHANGED WITH RESPECT TO SERVER TIME ZONE
SRVS
- 28607570 FP UNABLE TO COPY ACTIVITY CODE WITH SECURE CODE SETTING USING ACTIVITYSERVICE
ADMIN
IMPORTANT UPDATE: The major patch 18.8.1.0 for P6 EPPM is now available. The following list of patches have been added for Primavera
WEB
-
28543202 TEAM MEMBER LOGOUT URL FAILS WITH 404 NOT FOUND ERROR WHEN IT CONTAINS A ?
-
28538791 SELECT BUTTON IN OBS DIALOG BOX IS GREYED OUT.
-
28529604 FP PARAMETERS FROM P6 TO BI PUBLISHER NOT PARSED CORRECTLY
-
28493618 FP-MIGRATE.BAT COULD NOT REUSE EXISTING TABLESPACE
-
28473105 'UNABLE TO SAVE CHANGE' WHILE ADDING RESPONSE ACTION
-
28574985 ACTIVITIES PAGE DOES NOT LOAD
-
28443657 DELETING BASELINE OF A PROJECT WITH DOCS DELETES DOCS USING COLLAB SYNC SERVICE
-
28438080 TRYING TO ASSIGN A RISK MATRIX TO THE PROJECT BUT NOT ABLE TO SEE THE PROJECT
-
28428653 PROJECT ARBITER SETTINGS DO NOT ALWAYS UPDATE
-
28400300 NEW CALENDARS DO NOT INHERIT EXCEPTION TIME IN P6 WEB
-
28343769 ERROR: UNABLE TO LOAD DATA.. WHEN LOADING EPS PAGE
-
28300342 LAG IN DAYS DOES NOT CALCULATE CORRECTLY IN STANDARD VIEW.
-
28040417 P6 OUTPUT FOR A MULTIPLE TEXT PARAMETER CUTS OFF AFTER FIRST VALUE
-
27610537 17.12.1 PATCH UTILITY FAILS WHEN WEBLOGIC PASSWORD CONTAINS SPECIAL CHARACTERS
-
27264911 UNABLE TO CHECK 'HIDE IF EMPTY' WHEN USING MULTIPLE GROUPING BANDS
-
28423838 COPY/PASTE IS NOT WORKING FOR ACTIVITIES ASSIGNED WITH PREDECESSOR/SUCCESSOR
P6 CLIENT
-
28485598 UNABLE TO VIEW/UPDATE PROJECT LAYOUT FILTERS WITHOUT GLOBAL PRIVILEGES
-
28483918 USER PREFERENCES CAUSING USER TO NOT BE ABLE TO LOGIN
-
28268233 LARGE XER IMPORT IN PVD FAILS WITH ERROR \TSCLIENTC IS NOT ACCESSIBLE.
-
28536030 CHANGE THE FLAG IN PM WHEN READING THE REGISTRY FROM KEY_ALL_ACCESS TO KEY_READ
-
28477881 DEFAULT IMPORT TEMPLATE NAME SHOULD NOT BE EDITABLE FOR P6 XML IMPORT
-
28446230 CLOUDCONNECT HEAP MEMORY USAGE INCREASES OVER TIME DUE TO MEMORY LEAK
-
28392281 COPY/PASTE PROJECT DOES NOT DELETE PRIMARY RESOURCE WHEN IT IS NOT SELECTED
-
28181000 EXTERNAL SUCCESSORS MISSING IN DETAILS PANE
-
28368161 P6PROCLOUDCONNECT SERVERS CONTINUALLY LOCK UP WITH STUCK THREADS
-
27948468 AFMGS-1536-0 WHEN ADDING THE RISK COLUMNS PRE/POST DATES IN THE P6 CLIENT
Team Member
- 28547031 AND SHOW UP AS ' OR A BOX IN TIMESHEET NOTES
- 28444919 TIMESHEET EXPANDED ASSIGNMENTS OVERTIME AREA DRAWS INCORRECTLY
SRVS
- 28367094 READ PERIODATCOMPLETIONCOST FOR RESOURCEASSIGNMENT
IMPORTANT UPDATE: The major patch 18.8.0.1 for P6 EPPM is now available. The following list of patches have been added for Primavera
WEB/P6 Cloud Connect
- DELETING CODE TYPES WHOSE VALUES ARE HIERARCHICAL CAUSES DELETES OF OTHER CODES
The major release 18.8 for P6 EPPM is now available. The following list of enhancements have been added for Primavera P6 EPPM 18.8 For more information visit:

Performance has been enhanced in loading the Activities, EPS, Resource Assignment, Resources, Roles, and User Access pages when multiple user-defined fields are included in the review
IMPORTANT UPDATE - RELEASE P6 18.8
WEB
- New HTML5 userinterface for Risk
- Classic views from EPS, Activity, and Resource Assignments were removed
- Removal of applets impacts the following functionality:
- Resource Team Summary
- Open Request for Resource
- Resource Analysis Chart: Replaced with improved charts in Resources/Resource Analysis
- My Workgroups
- Import global data to/export global data from P6: Import and export data via Excel on the Enterprise Data page. This feature is helpful for periodic updates of enterprise data. Existing data can be updated and new data can be added. If data fails to import, download a copy of the import file with appended information on why data failed to import. In this release, activity code import and export has been implemented.
- Assign project preferences at EPS level in Standard view: Preferences are applied to all projects in the specified EPS node and its child nodes
- Manage personally identifiable information in P6 EPPM and Professional
- Improved Visibility of Activity Information and Streamlined Bulk Edit Functionality In P6 for Android
- Interactive Gantt in the Standard View of the Activities Page and the Capacity Planning Page
- Create multiple user views on the EPS, Activities, Resource Assignment, and Project Assignment pages
- Performance Percent Complete Field Based On Labor Units
- Import and Export Location with Projects
TM
- Grouping and filtering improvements: Use up to five criteria to filter activity data. Group activities and assignments by project and WBS
- Filter based on the primary resource assigned to an activity in P6 for Android and P6 for iOS.
- Search the activity list based on codes and user-defined fields in P6 for Android and P6 for iOS.
- Use a setting in P6 to restrict whether resources in Team Member Web, P6 for Android, and P6 for iOS can assign themselves to activities outside the resource’s OBS access.
Prime
- Integration with Oracle Prime: Integration with Oracle Prime Import tasks from the Oracle Prime Projects Tasks to P6 Professional when connected to an EPPM database to integrate your lean scheduling process with P6. Prime tasks are visible in P6 Client as tasks assigned to activities in integrated projects
- Prime Sync is no longer supported in P6 EPPM: Use Primavera Gateway to configure a connection between P6 and Oracle Prime Projects.
- The following special operation event triggers have been added: Publish Audit Data Job Service, Global Search and Replace Job Service, Import Job Service, Export Job Service, and Update Baseline Job Service
- Import tasks from the Oracle Prime Projects Tasks app for lean scheduling in P6
INTG/Webservices
- Performance Enhancements.
P6PRO
- Import:
- View XML Import and Export Logs Without P6 EPPM:
- View XML import and export logs without the need for P6 to be installed on Primavera Virtual Desktop.
- Import Zipped XER Files:Import XER files directly from a zipped file without the need to decompress the file manually before importing
- Improvements in offline working: View the date and time when a project was last cached in the Last Cached Date column in the Projects View
- Performance Percent Complete field based on labor units:The Performance % Complete-Labor Units field in P6 Professional shows the percentage earned value of the budget at completion as calculated from labor units
- Upload Graphics to View and Print From Any Location in P6 Professional
The monthly cloud release for P6 EPPM is now available. The following issues were resolved for Primavera P6 EPPM 17.12.6.
IMPORTANT UPDATE - RELEASE P6 17.12.6
WEB
- 8149464 BI REPORT REFRESHING PARAMETERS INCORRECTLY
- 28136391 RESOURCE PROFILE SHOWS DUPLICATE HOURS IN P6 WEB FOR PERIOD W ZERO HOURS LIMIT
- 28124888 EXPECTED FINISH TIME SHOULD NOT GO AS 00:00 WHEN SETTING IS DO NOT SHOW TIME -TM
- 28112160 FP ERROR PARSING JOB_DATA BLOB FOR JOB 'PX RESOURCE ROLE ASSIGNMENT SPREAD...'
- 28070890 FINISH MILESTONE BASELINE DATES EQUAL TO DATA DATE
- 28039564 GANTT CHART MISSING WHEN PRINTING TO PDF IN P6 WEB
- 28034647 COLUMN AREA WIDTH MISSING FROM PDF OPTIONS DIALOG BOX
- 28018886 START DAY IS MOVED 1 DAY AHEAD WHEN IMPORTING A XML IN MSP
- 28008149 FP ERROR IMPORTING XML AND LOG DOESN'T EXPLAIN THE CAUSE FOR THE ERR
- 27996660 START MILESTONES SHOW WRONG LIST OF PRIMARY CONSTRAINTS
- 27989119 CANNOT SELECT ANY APPLIED FILTER IN FILTERING CRITERIA
- 27980358 FP-BUG-27614290 UNABLE TO CHANGE REVIEWER FOR TM UPDATES IN STANDARD VIEW
- 27970552 COPYING PROJECT REMOVES COST AND RESOURCE ASSIGNMENTS
- 27969892 FP THE ACTIVITY IDS ARE NOT CREATED BASED ON CHANGED ACTIVITYSUFFIX IN PREFERENC
- 27958966 SEARCH IN P6 WEB RETURNS NO RESULTS WHEN SEARCHING ON A NUMBER
- 27875744 TEAM MEMBER FILTER SAVE BUTTON DOESN'T ACTIVATE AFTER ADDING A NEW FILTER
- 27831924 MISSING BIP PARAMETERS WHEN REVIEWING REPORT IN P6
- 27692598 NULL VALUE ON APP_NAME IN USESSAUD TABLE
TM
- 28031733 IE11: TIMESHEETS - THE EXPECTED FINISH DATE TIME IS NOT SAVED CORRECTLY.
- 28031471 TM: UNABLE TO SAVE EXPECTED FINISH DATE IN UPDATE ACTIVITIES PAGE.
- 27967035 EPPM/TEAM MEMBER TIMESHEET DAILY VALUE DISPLAYS NAN/NAN
- 27966926 FP-BUG 27717019 - SUBMIT BUTTON UNAVAILABLE AFTER ENTERING NEGATIVE HOURS IN TM
- 27966881 FP-USER CAN EDIT OVERTIME HOURS ENTRIES IN TIMESHEETS FOR AN INACTIVE PROJECT
SRVS
- 28104540 COPY PROJECT SERVICE LEASING DB CONNECTION TOO EARLY, WHICH CAUSES TIMEOUTS
- 27619272 TRANSACTION (PROCESS ID 65) WAS DEADLOCKED ON LOCK - RESOURCE ROLE PUBLICATION
ADMIN
- EPPM DB SETUP COULD NOT UPGRADE A SQL 16.2.4 EPPM DB WHICH'S CONVERTED FROM PPM
INTG
- 27718920 WEB SERVICES CLOUD: TOKEN DEPLOYMENT SUB PAGE RETURNED FOR COOKIES WSDL URL
P6PRO
- 27839226 EPS NODES MOVE WHEN EXPANDING / COLLAPSING
- 27834045 VISUALIZER CREATE NEW FROM EXISTING DOES NOT COPY LAYOUT FILTER
- 27807558 ERROR OCCURS WHEN IMPORTING P6 XML FILE INTO SQLITE DB
- 27996159 ERROR: THE USER NAME OR PASSWORD IS INVALID RUNNING DBCONFIG FOR API
- 27990445 FP BASELINE UPDATE PROCESS RESULTS IN ACITIVITES MISSING EARLY DATES
- 28140116 VISUALIZER SAVE AS DOES NOT COPY LAYOUT FILTERS
- 27509167 SDK STORED PROCEDURE COPY_PROJECT RUNS SUCCESSFULLY BUT DOES NOT COPY ACTIVITIES
- 27226223 EPS ACTIVITY CODES ARE NOT VISIBLE IN GROUP/SORT OR FILTER AFTER COPYING PROJECT
- 26696189 ERROR XML IS NOT A VALID XML FILE WHEN IMPORTING P6 XML INTO P6 WEB
- 24360631 JAVA.LANG.INDEXOUTOFBOUNDSEXCEPTION IMPORTING XML FILE INTO P6 WEB
- 27862286 VISUALIZER STILL SHOWS SECOND GROUPING WHEN FIRST GROUPING IS SET TO INDENT
The monthly cloud release for P6 EPPM is now available. The following issues were resolved for Primavera P6 EPPM 17.12.7.
IMPORTANT UPDATE - RELEASE P6 17.12.7
WEB
- 28280407 GROUP BY COST ACCOUNT SHOWS INTERNAL ID INSTEAD OF NAME
- 28269550 ALL EXCEPT USERS & PROFILES GSP CANNOT SAVE CREATION OR EDIT OF NOTEBOOK TOPICS
- 28254060 INTERNAL FP - BUG 27952289 - SEND TO UNIFIER JOB FAILED WITH BLOCK TRANSACTIONS
- 28209191 FINISH MILESTONE DATE CHANGES AFTER MILESTONE CREATION
- 28198869 SETTING NONWORK IN CALENDAR CHANGES THE SCHEDULE FOR NEXT WEEK
- 28169827 FP- VIEW SERVICE STATUS SHOWS INCORRECTLY FOR SUMMARIZE/PUBLISH INACTIVE
- 28094971 EXPENSE COST DISPLAYS DECIMAL REGARDLESS OF PREFERENCE SETTINGS
- 27977527 FILTERING FUNCTION OF SELECTING RESOURCE CODE DOES NOT WORK
- 27865468 AF-2339-FROZEN PROJECT GANTT CHART IN IE ON WINDOWS 7
- 27768169 ALL P6 COSTS ARE SHOWN IN NON-LABOR COST IN UNIFIER
- 27536015 STANDARD ACTIVITY VIEW FAILS TO LOAD USING IE11 UNDER WINDOWS 7
- 28239835 COPY PASTE PROJECT WITH ASSIGNED BL IS NOT ASSIGNED TO NEWLY CREATED PROJECTNG
TM
- 28053338 ACTIVITY START DATE IS POPULATED WITH CURRENT DATE/TIME IN TM WEB
- 28314942 IMPORT XLSX DISPLAYS THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE...
- 28261483 FP: 28174800-P6 CLIENT SWAPS BACK AND FORTH BETWEEN THE PROJECTS AND RESOURCE
- 28027812 IMPORTING XLS CAUSES ACTIVITIES TO BE DELETED
- 27939143 RESOURCEASSIGNMENTSPREAD VIEW SEEMS TO HAVE INVALID REFERENCE
P6PRO
- 27594102 ACTIVITY CODE OR UDF IN RUSSIAN CAUSES P6 PRO LOGIN FAILURE USING CLOUD CONNECT
- 28295293 ERROR: START_DATE: INVALID VALUE OR DATA TYPE MISMATCH WHEN IMPORTING XLS
- 28090747 PRINTER PATH LENGTH WILL CAUSE P6 TO CRASH ON PRINT PREVIEW
- 27990662 VTABLE IS NOT LOADED - PROJECT IS THROWN WHILE LOGIN INTO PRO CLOUD CONNECT.
The monthly cloud release for P6 EPPM is now available. The following issues were resolved for Primavera P6 EPPM 17.12.5.
IMPORTANT UPDATE - RELEASE P6 17.12.5
WEB
- 28019256 ACTIVITY UDF INDICATOR OPENS IN EXCEL DISPLAYING HTML INSTEAD OF COLOR
- 27940397 ERROR WHEN APPLYING FINISH TO A FINISH MILESTONE IN STANDARD VIEW
- 27938802 ONLY ADMIN SUPERUSER PROFILES CAN CONVERT ANOTHER PROJECT AS A BASELINE
- 27935973 OK BUTTON DOES NOT LOAD ATTEMPTING TO ASSIGN A NOTEBOOK TOPIC TO A PROJECT
- 27919926 THE OPTION "REVIEW REQUIRED" ISN'T ACCESSIBLE TO ENABLE/DISABLE
- 27910588 FP DEFAULT PARAMETERS FOR SCHEDULED REPORT IS DIFFERENT THAN P6 REPORT
- 27901343 FP BUG 27774086 - PARAMETERS WINDOW UNRESPONSIVE WHEN RUNNING BIP REPORT IN P6
- 27740592 CONFIRM PROMPT TO REMOVE UNITS/COSTS NOT ALWAYS SEEN DELETING RESOURCE ASSGNMENT
- 27669501 ERROR: 'MISSING EXPRESSION' ATTEMPTING TO LOAD RESOURCE ASSIGNMENTS VIEW
- 27598734 ISSUE PAGE DOES NOT LOAD FOR A SPECIFIC USER
- 27559500 ACTIVITIES PAGE IN P6 WEB DOES NOT LOAD FOR 1 USER
- 27419880 CANNOT SAVE PROJECT PREFERENCES CHANGE IF WBS_MAX_SUM_LEVEL IS NULL
- 27273835 CANNOT SAVE UNIFIER INTEGRATION SETTINGS FOR SCHEDULE SHEET IN P6 WEB CLIENT
- 27193859 SEVERE: NULL JAVA.LANG.NULLPOINTEREXCEPTION DURING XML IMPORT
- 27162417 P6 EPPM R17.9: DB MIGRATION FROM ORACLE TO MS SQL: LOSING UNICODE SYMBOLS DURING
INTG
- 28005374 ERROR "FIELD PLANNEDSTARTDATE MAY NOT BE SET TO NULL" WHEN IMPORTING XML
TM
- 27855894 EXPECTED FINISH DATE UPDATES VIA TIMESHEETS -> UPDATE DATES SHIFT 1 DAY EARLIER
- 27590132 AUTOMATICALLY ADD CURRENT ACTIVITIES TO TIMESHEET ADDS ALL INCOMPLETE ACTIVITIES
- 27910686 FP-FILTER ERROR: INVALID FORMAT. (THROUGH REFERENCE CHAIN: JAVA.UTIL.ARRAYLIST
- 27910637 FP-COPY TASKS FROM PREVIOUS TIMESHEET OPTION IS NOT ENABLED
DB
- 27939143 RESOURCEASSIGNMENTSPREAD VIEW SEEMS TO HAVE INVALID REFERENCE
P6PRO
- 27767748 DAY AND MONTH ARE SWITCHED DURING EXCEL EXPORT/IMPORT
- 27267769 EXPORTED XLSX FILE WITH CHINESE CHARACTERS DISPLAYING AS QUESTION MARKS IN EXCEL
- 27593972 JAPANESE CHARACTERS IN UDF FIELDS ARE EXPORTED FROM SQLITE TO XLSX AS GARBLED
The monthly cloud release for P6 EPPM is now available. The following issues were resolved for Primavera P6 EPPM 17.12.4
IMPORTANT UPDATE - RELEASE P6 17.12.4.
WEB
- 27856969 COLUMN SORT IS ALSO SORTING THE GROUP BANDS
- 27850664 NEW RESOURCES ARE NOT ADDING WHILE UPDATING BASELINE
- 27808149 UNDESIRABLE INSTANT SEARCH AUTOMATICALLY OCCURS WHEN TYPING CHARS SEARCHING PROJ
- 27787022 ASSIGNING A CBS CODE TO A RESOURCE ASSIGNMENT IN PROJ>RES ASSIGN JUST SPINS
- 27748153 ACTIVTY EDITING IN THE USER INTERFACE VEIWS IS BLANK
- 27738751 PRIMARY ROLE CHECKBOX IS NOT SAVED ON FIRST SELECTION WHEN ADDING RESOURCE
- 27724751 INCREASE TIMEOUT FOR GATEWAY JOBS RUN FROM P6
- 27699240 STANDARD HTML5 VIEW DOES NOT PROMPT TO DELETE SUMMARY DATA
- 27685063 CAPACTIY PLANNING TAKES 30 SECOND TO SEVERAL MIN TO LOAD
- 27600346 PLANNED UNITS AND REMAINING UNITS CHANGE TO ZERO WHEN CHANGING THE START DATE
- 27560390 IMPORT XML ERROR 17.12.1: CANNOT REMOVE ACTUAL START IF RESOURCE HAS ACTUAL WORK
- 27534608 ASSIGN RESPONSIBLE MANAGER OBS HIERARCHY DOES NOT LIST IN CORRECT ORDER
- 27534474 CANNOT PASTE INTO UDF FORMULA USING IE11
- 27512163 P6 WEB RESPONSE TIME IS TOO SLOW DUE TO LOADING UDFS
- 27330150 UNABLE TO SEARCH INACTIVE RESOURCE IN PROJECT OWNER
INTG
- 27833622 GATEWAY SYNC JOBS FAILING WITH TIMEOUTS
TM
- 27697567 FP-TM SAVED INFORMATION BLANKS OUT FOR PRIMARY RESOURCE BUT NOT ACTIVITY OWNER
- 27677942 TEAM MEMBER UPDATE ACTIVITY % COMPLETE ZEROES OUT REMAINING DURATION
P6PRO
- 27730514 VTGFF-1400-C ERROR WHEN ADDING A VALUE FOR A GLOBAL ACTIVITY CODE
- 27726822 P6 DISPLAYS AVERAGE HOURS/DAY FOR TASKS UPDATED FROM TEAM MEMBER TIMESHEET
- 27689611 INCONSISTANT BEHAVIOR ON CREATING BASELINE IN PROFESSIONAL CLIENT AND WEB
- 27608052 VISUALIZER SAVE-AS FLOW DOES NOT MATCH SAVE FLOW
- 27438842 FILTER WITH DD NOT CONVERTING WITH LANGUAGE CHANGE TO GERMAN PROPERLY
- 27433130 JAPANESE CHARACTER DID NOT DISPLAY PROPERLY ON GANTT CHART
- 27420104 SUMMARIZE TO WBS LEVEL CAN BE SAVED AS BLAN
- 26046890 INCORRECT & INCONSISTANT TIMEZONE IN P6 PROFESSIONAL 17.4