Contract Management tracks Drawings, Drawing Revisions and Drawing Sets. This is possible through two modules in Contract Management. Drawings and Revisions are recorded in the Drawings module. Each drawing or drawing revision can then be included in a Drawing Set.

Other documentation that is revised and bundled into sets, such as specifications or conceptual reports can also be tracked in the Drawings module.

Process

  • Create Drawings
  • Attach to Sets
  • Note Reviewer
  • Add in revisions as required

Benefits

  • One place for all drawings
  • Transmittals preparation automated
  • Centralized reports
  • Ball-in-court tracking